Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 24, 2026 at 7:00 PM

Updated November 26, 2026

Renovation of an educational facility in Mankato, Minnesota. Completed plans call for the renovation of a 13,140-square-foot educational facility.

Provide design and construction administration services to reroof the Wiecking Center Annex. The existing building is a pre-engineered metal building. Project scope includes the removal of spray foam insulation, roof system evaluation and recommendation, and phasing the roof replacement to allow equipment to remain in the building. Provide design and construction administration services to reroof the Wiecking Center Annex. The building is a pre-engineered metal building constructed in 1982, with an addition in 2007 (total SF approximately 13,140 sf.). Portions of the original blanket insulation have been removed and replaced with spray foam insulation which will need to be removed as part of this project. Interior finishes will be required to appear finished as an occupied space. Due to the types of equipment that are in this building, the Owner would prefer to phase roof replacement to allow the equipment to remain in the building during construction . The design team will be responsible for evaluating the building and providing recommendations on the best roof system for this facilit. Question Deadline Dec 10, 2026 at 2:00 PM Question submitted to Greg Borchert Project Manager greg.borchert@mnsu.edu

GC Bidding

$459,900.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 22, 2026

June 7, 2027

Project location map

228 Wiecking Center, Mankato, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed