Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 25, 2026 at 7:00 PM

Updated November 29, 2026

Site work and renovation of an educational facility in Duluth, Minnesota. Completed plans call for the renovation of a educational facility.

Roof replacement project involving removal of existing EPDM roof systems, installation of new 4-ply BUR systems, raising parapets, structural roof reinforcement, ceiling and lighting replacement, installation of new roof drains/piping, and mechanical/electrical/technology service re-installation at multiple roof areas. Key features of the project include: _ Main Building A - Area A5 & A6: Remove existing EPDM roof system on Roof Areas A5 & A6. _ Raise the existing parapets and install new plywood, underlayment, and sheet metal fascia over the existing prefabricated aggregate fascia panel . _ Remove and replace the existing sheet metal wall panels at the exterior walls adjacent to the roof replacement area on roof Area A6. _ Remove the existing obsolete precast aggregate overflow scuppers which are cast into the existing prefabricated aggregate fascia panel at the existing roof edge. Infill deck at obsolete mechanical equipment is removed. Install new primary and overflow roof drains/ piping, which may require the upsizing of the primary roof drains and the addition of new primary and overflow roof drains, piping, and overflow scuppers to meet current code requirements and Minnesota State standards. Areas A5 and A6 will require structural roof reinforcement leading to ceiling and lighting replacement. Structural design to remove the obsolete access ladder at roof Area A5 to roof Area A6 and replace with a new OSHA approved access ladder. _ Where structural reinforcement is required, bar joists will be reinforced in place. _ Mechanical and electrical and technology services will require removal and reinstallation. The south and north roof edges will require new parapet blocking to achieve Minnesota State standards. _ Install a new 4- ply BUR system. Question Deadline 12/11/2026 at 10:00 AM CT only questions submitted by email for clarifications about this RFQ will be addressed . Responder questions must be emailed to the attention of: Name: Ryan Gideon Title: Project Manager Email: Ryan.gideon@minnstate.edu

GC Bidding

$3,067,200.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
23
Bidding Soon
285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2027

May 3, 2027

Project location map

2101 Trinity Rd, Duluth, MN

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed