Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 25, 2026 at 7:00 PM

Updated November 27, 2026

Site work, paving, outdoor lighting and new construction of a road / highway in Hendersonville, Tennessee. Completed plans call for the construction of a road / highway; and for outdoor lighting for a road / highway.

Construction of a new roundabout at the intersection of Rockland Road and Imperial Boulevard, including pedestrian crossings, signage, lighting, and pavement markings. City of Hendersonville, an Equal Opportunity, Affirmative Action Employer, seeks to retain the services of a professional consultant engineering firm to provide services related to construction of Rockland Road and Imperial Blvd Intersection Improvement, PIN 137879.00. This STBG U funded project involves the construction of a new roundabout at the intersection of Rockland Road and Imperial Boulevard to systematically reduce delays, calm vehicular speeds, and eliminate high-severity angle collision points. Replacing the existing intersection control with a continuous-flow design will optimize traffic movement during peak hours while enhancing overall safety along this key municipal connector. The scope includes defined pedestrian crossings, upgraded directional signage, improved lighting, and durable pavement markings designed to accommodate motorists, freight, and pedestrians safely and efficiently. . The project shall be accomplished in accordance with TDOT Local Programs guidelines. The professional consultant engineering consulting firm must be on TDOT's pre-approved list or have a completed pre-qualification form filed with TDOT by the deadline for the Letters of Interest. The prequalified firm must have unlimited status. Estimated Schedule for Performance of Work o Estimated Start of project: March 2027 o Estimated completion of preliminay design and enviromental: March 2028 o Estimated completion of design and ROW: March 2028 o Estimated completion of ROW acquisition and utility corrdination: March 2029 o Estimated start of construction: September 2029 o Estimated completion of project: February 2031

GC Bidding

$1,500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
86
Bidding Soon
1,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 28, 2026

September 1, 2029

Project location map

Rockland Rd & Imperial Blvd, Hendersonville, TN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed