BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Rockport, Texas. Completed plans call for the construction of a 45,036-square-foot, two-story above grade municipal facility; 27,500-square-foot, two-story above grade municipal facility; and for site work for a sidewalk / parking lot.

Aransas County and City of Rockport Downtown Anchor Project 1. Aransas County DTA - County Courthouse. Work scope includes:Two-Story, 45,036 sq. ft. County Courthouse Building with concrete structure, masonry, cast stone and stucco exterior with standing seam metal roof, low slope modified bitumen roof system, and associated sitework and utilities. Scope includes Earthwork, Site Utilities, Concrete Paving, Removal Of Existing Pavement, Structural Excavation And Backfill Cast-in-Place Concrete, Unit Masonry, Structural Steel Framing, Rough Carpentry, Interior Architectural Woodwork, Plastic-Laminate-Clad Architectural Cabinets, Building Insulation, Modified Bituminous Membrane Roofing, Standing Seam Sheet Metal Roofing, Hollow Metal Doors & Frames, Flush Wood Doors, Aluminum-Framed Entrances And Storefronts, Aluminum Windows, Security Windows, Non-Structural Metal Framing, Stucco, Gypsum Board, Ceramic Tiling, Acoustical Panel Ceilings, Brick And Concrete Pavers, Tile Carpeting, Fabric-Wrapped Panels, Exterior Interior Painting, Phenolic-Core Toilet Compartments, Toilet, Bath, And Laundry Accessories, Canopies, Security Locks And Hardware, Solid Surfacing Countertops, Quartz Agglomerate Countertops, Machine Room-Less Electric Traction Passenger Elevators, Wet Pipe Sprinkler System, Mechanical, Electrical and Plumbing Systems Diesel Engine - Driven Standby Generating System, Lighting Protection System, Integrated Audio-Video System And Equipment, Emergency Radio Communication Enhancement System, Access Control System, Video Surveillance System, Intrusion Detection System Fire Alarm And Smoke Detection System With Voice Evacuation. 2. City of Rockport - City Hall. Work scope includes: Two-Story, 27,500 sq. ft. City Hall Building with concrete structure, masonry, cast stone and stucco exterior with standing seam metal roof, low-slope modified bitumen roof system, and associated sitework and utilities. Scope includes Earthwork, Site Utilities, Concrete Paving, Removal Of Existing Pavement, Structural Excavation And Backfill Cast-in-Place Concrete, Unit Masonry, Structural Steel Framing, Rough Carpentry, Interior Architectural Woodwork, Plastic-Laminate-Clad Architectural Cabinets, Building Insulation, Modified Bituminous Membrane Roofing, Standing Seam Sheet Metal Roofing, Hollow Metal Doors & Frames, Flush Wood Doors, Aluminum-Framed Entrances And Storefronts, Aluminum Windows, Security Windows, Non-Structural Metal Framing, Stucco, Gypsum Board, Ceramic Tiling, Acoustical Panel Ceilings, Brick And Concrete Pavers, Tile Carpeting, Fabric-Wrapped Panels Exterior and Interior Painting, Phenolic-Core Toilet Compartments, Toilet, Bath, And Laundry Accessories, Canopies, Security Locks And Hardware, Solid Surfacing Countertops, Quartz Agglomerate Countertops, Machine Room-Less Electric Traction Passenger Elevators, Wet Pipe Sprinkler System, Mechanical, Electrical and Plumbing Systems Diesel Engine - Driven Standby Generating System, Lightning Protection System, Underground Ducts & Raceways For Communications, Communications Devices and Cabling and Fire Alarm And Smoke Detection System With Voice Evacuation, Communications Devices and Cabling, Emergency Radio Communication Enhancement System, Access Control System, Video Surveillance System, Intrusion Detection System and Integrated Audio-Video System And Equipment are to be provided by the Owner's subcontractors. Awarded General Contractor is responsible for coordinating work within the contract with the work of the Owner's subcontractors. PSI Project 286-2267, 200099.000 **As of March 02, 2022, project has been awarded to a general contractor. Construction starts in 1 month with a construction time of 486 calendar days.

Award

Municipal

$22,750,000.00

Public - County

New Construction, Paving, Site Work

307

58

233

7

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
14
Bidding Soon
222
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

April 4, 2022

img_map_placeholder

Multiple Locations, Rockport, TX


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.