Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Rockport, Texas. Completed plans call for the construction of a 45,036-square-foot, two-story above grade municipal facility; 27,500-square-foot, two-story above grade municipal facility; and for site work for a sidewalk / parking lot.
Aransas County and City of Rockport Downtown Anchor Project 1. Aransas County DTA - County Courthouse. Work scope includes:Two-Story, 45,036 sq. ft. County Courthouse Building with concrete structure, masonry, cast stone and stucco exterior with standing seam metal roof, low slope modified bitumen roof system, and associated sitework and utilities. Scope includes Earthwork, Site Utilities, Concrete Paving, Removal Of Existing Pavement, Structural Excavation And Backfill Cast-in-Place Concrete, Unit Masonry, Structural Steel Framing, Rough Carpentry, Interior Architectural Woodwork, Plastic-Laminate-Clad Architectural Cabinets, Building Insulation, Modified Bituminous Membrane Roofing, Standing Seam Sheet Metal Roofing, Hollow Metal Doors & Frames, Flush Wood Doors, Aluminum-Framed Entrances And Storefronts, Aluminum Windows, Security Windows, Non-Structural Metal Framing, Stucco, Gypsum Board, Ceramic Tiling, Acoustical Panel Ceilings, Brick And Concrete Pavers, Tile Carpeting, Fabric-Wrapped Panels, Exterior Interior Painting, Phenolic-Core Toilet Compartments, Toilet, Bath, And Laundry Accessories, Canopies, Security Locks And Hardware, Solid Surfacing Countertops, Quartz Agglomerate Countertops, Machine Room-Less Electric Traction Passenger Elevators, Wet Pipe Sprinkler System, Mechanical, Electrical and Plumbing Systems Diesel Engine - Driven Standby Generating System, Lighting Protection System, Integrated Audio-Video System And Equipment, Emergency Radio Communication Enhancement System, Access Control System, Video Surveillance System, Intrusion Detection System Fire Alarm And Smoke Detection System With Voice Evacuation. 2. City of Rockport - City Hall. Work scope includes: Two-Story, 27,500 sq. ft. City Hall Building with concrete structure, masonry, cast stone and stucco exterior with standing seam metal roof, low-slope modified bitumen roof system, and associated sitework and utilities. Scope includes Earthwork, Site Utilities, Concrete Paving, Removal Of Existing Pavement, Structural Excavation And Backfill Cast-in-Place Concrete, Unit Masonry, Structural Steel Framing, Rough Carpentry, Interior Architectural Woodwork, Plastic-Laminate-Clad Architectural Cabinets, Building Insulation, Modified Bituminous Membrane Roofing, Standing Seam Sheet Metal Roofing, Hollow Metal Doors & Frames, Flush Wood Doors, Aluminum-Framed Entrances And Storefronts, Aluminum Windows, Security Windows, Non-Structural Metal Framing, Stucco, Gypsum Board, Ceramic Tiling, Acoustical Panel Ceilings, Brick And Concrete Pavers, Tile Carpeting, Fabric-Wrapped Panels Exterior and Interior Painting, Phenolic-Core Toilet Compartments, Toilet, Bath, And Laundry Accessories, Canopies, Security Locks And Hardware, Solid Surfacing Countertops, Quartz Agglomerate Countertops, Machine Room-Less Electric Traction Passenger Elevators, Wet Pipe Sprinkler System, Mechanical, Electrical and Plumbing Systems Diesel Engine - Driven Standby Generating System, Lightning Protection System, Underground Ducts & Raceways For Communications, Communications Devices and Cabling and Fire Alarm And Smoke Detection System With Voice Evacuation, Communications Devices and Cabling, Emergency Radio Communication Enhancement System, Access Control System, Video Surveillance System, Intrusion Detection System and Integrated Audio-Video System And Equipment are to be provided by the Owner's subcontractors. Awarded General Contractor is responsible for coordinating work within the contract with the work of the Owner's subcontractors. PSI Project 286-2267, 200099.000 **As of March 02, 2022, project has been awarded to a general contractor. Construction starts in 1 month with a construction time of 486 calendar days.
Award
Municipal
$22,750,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2021
April 4, 2022
Multiple Locations, Rockport, TX
Related To This Project
Rockport, TX
Bid Date: Dec 09 2021
Rockport, TX
Bid Date: Nov 30 2020
Rockport, TX
--
Rockport, TX
Bid Date: Mar 08 2022
Rockport, TX
Bid Date: Mar 22 2022
Rockport, TX
Bid Date: May 05 2022
Rockport, TX
Bid Date: Jun 29 2022
Rockport, TX
Bid Date: Jul 28 2022
Rockport, TX
--
Rockport, TX
Bid Date: Feb 04 2022
Rockport, TX
Bid Date: Dec 09 2021
Rockport, TX
Bid Date: Jan 21 2022
Rockport, TX
Bid Date: Jan 11 2022
Rockport, TX
Bid Date: Jan 14 2022
Rockport, TX
Bid Date: Nov 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.