BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2024 at 8:00 PM

Updated July 3, 2025

Site work and paving for a civil project in Brunswick, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The project would primarily consist of the ful depth rebuild on Atwood Lane and Bowdoin, Berry and Whittier Streets. The project will also consist of watermain replacements on Bowdoin, Berry, and Whittier Streets. The scope of work for this project includes furnishing and installing all materials, labor, and equipment necessary for the full depth reconstruction of Atwood Lane, Berry, Bowdoin, and Whittier Streets. Other work to be performed includes replacement of catch basins and utility covers as necessary. Major quantities include: two thousand two hundred and fifty (2,250) cubic yards of aggregate subbase course - gravel, four hundred and sixty-five (465) cubic yards of aggregate base course - Type A, one thousand one hundred and five tons (1,105) of hot mix asphalt, fourteen (14) catch basin type A1-C, and one thousand (1,000) square yards of shoulder aggregate. Each bidder is required to state, in his/her proposal, his/her name and place of residence and the names of all persons or parties interested as principals with him/her, and that the proposal is made without any connection with any other bidder making any proposal for the same work, and that no person acting for or employed by the Town of Brunswick is directly or indirectly interested in the proposal or in any contract which may be entered into to which the proposal relates, or in any portion of the profits there from, except as provided by the Town Charter. Question Deadline 03/29/2024 All questions by prospective bidders pertaining to the Contract Documents, Plans and Specifications must be received, in writing, by the Engineer, at least five (5) days before the date set for the opening of the Proposals.

Post-Bid

Water / Sewer

$670,000.00

Public - City

Paving, Site Work

7

12

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
33
Bidding Soon
679
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2024

May 1, 2024

Project location map

Multiple Locations, Brunswick, ME


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.