BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 23, 2022 at 7:00 PM

Updated July 3, 2025

Site work for a bridge / tunnel in Cape Elizabeth, Maine. Completed plans call for site work for a bridge / tunnel.

Estimated construction budget is currently $300K-$425K. Location The Willow Brook Large Culvert Replacement is located along the Greenbelt Trail off of Starboard Drive in Cape Elizabeth, Maine. Outline of Work The work includes: Replacement of an existing deteriorating culvert with a 12 Span X 4 Rise X 50 Length Precast 3-Side Open Bottom Concrete Box Culvert with a simulated streambed material in order to allow for sufficient fish passage through this crossing. The instillation of this culvert will include; excavation, instillation of culvert and related backfill, gravels, base and surface pavements. Basis of Award Contract shall be awarded to the responsible bidder whose bid, complying with conditions and requirements provided in this Notice and bid form, is the lowest total base bid as identified on the bid form. Other Information The contract shall make note of the schedule requirements presented in the contract documents. The Town intends to begin construction of the project in or after July 2022 with completion of the work in its entirety by October 15, 2022. The Contract Documents may be examined at the following locations: 1. Sebago Technics, Inc., 75 John Roberts Road, Suite 4A, South Portland, ME 04106 Questions received less than 5 working days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. A completed Bid Form, Bid Security, Experience and Qualifications Statement with verification of bonding capacity and other attachments identified in the instructions must be submitted with the Bid. Within five days after the receipt of bids, the apparent low responsive bidder shall deliver to the Engineer and Owner for review and acceptance the listing of subcontractors, suppliers or entities for the work listed in Supplementary Condition SC-7.06. The successful bidder must furnish within 10 calendar days after the Notice of Award the required number of copies of the signed Agreement, 100% Performance Bond, 100% Payment Bond, Insurance Policy and begin execution of this contract within 10 calendar days following the Notice to Proceed. The General Contractor shall be responsible for the full amount the 100% Performance Bond and the 100% Payment Bonds. Combining bonds of subcontractors is not acceptable. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$425,000.00

Public - City

Site Work

9

8

12

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
64
Bidding Soon
1,126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2022

July 1, 2022

Project location map

Starboard Dr, Cape Elizabeth, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.