BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated July 3, 2025

Site work and new construction of a pre-engineered storage facility in Chapman, Maine. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The United States Department of Agriculture (USDA), Agricultural Research Service (ARS) has a requirement at Chapman, ME. Solicitation 12305B25R0017 is issued as a Request for Proposals (RFP). The solicitation document, with the incorporated clauses and provisions, will be issued in accordance with the Federal Acquisition Regulation (FAR) Parts 15 and 36 and will be incorporated in the awarded firm-fixed price contract. Interested vendors should reference the solicitation documents for all terms and conditions. All interested parties are responsible for monitoring this website to ensure they have the most current information (i.e. Amendments) for the solicitation. No paper solicitation will be available. This will be evaluated using Lowest Price Technically Acceptable (LPTA), see solicitation for evaluation factors and submission requirements, sections L and M. Award will be Firm Fixed Price (FFP). Notice of Set-Aside for Small Business Concerns: This requirement is a Total Small Business Set Aside. The associated NAICS Code is 236210, Industrial Building Construction. The small business size standard is $45.0 million. IAW FAR 36.204, the magnitude of this project is between $100,000 and $250,000. Period of performance is 120 days after receipt of the Notice to Proceed. Bonds: If the contract exceeds $35,000, the offeror to whom award is made shall furnish a payment security, which can be a payment bond or an alternative form per FAR 52.228-13, Alternative Payment Protections. Awards exceeding $150,000 require both Payment and Performance Bonds. See solicitation details regarding a Bid Bond, which will be required. Site Visit: An organized site visit will be conducted. An organized site visit has been scheduled for- April 4th, 2025 at 9:00AM ET. See FAR 2.236-27 for details. The site visit will be held at the project location. In order to attend the site visit, you will be required to pre-register. Details in the SF 1442 posted. The site visit will be held for the purpose of providing contractors with the opportunity to familiarize themselves with the site which may be helpful in the preparation of offers. Attendance at this site visit is not mandatory for offer submission; however, failure to visit the site will not relieve or mitigate the successful contractor's responsibility and obligation to fully comply with the terms, conditions and specifications contained and/or referenced in this document. Telephone requests for information will not be accepted or returned. Biobased Products: This procurement requires the use of Biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably priced. The products should first be acquired from the USDA designated product categories. All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable, include the exclusive use of biobased and recycled products. Please visit www.biopreferred.gov for more information on the USDA Biobased Program and to reference the catalog of mandatory biobased products. DESCRIPTION OF WORK: The work to be done consists of furnishing all labor, materials, and equipment and performing all work in accordance with these specifications and drawings for: Project Title: Insulate Potato Storage Barn Project Location: Presque Isla, ME 980 Carvell Road Chapman, ME The proposal shall provide Base and Option pricing as defined in the contract documents. The project will include, but not be limited to the following: The contractor shall provide all services including all labor, equipment, parts, materials, supplies, supervision, tools, equipment, transportation, and insurance necessary to provide pneumatic conversion over to electronic actuated devices and other items as shown and described in Contract Documents specifications and drawings listed herein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$500,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
10
Bidding Soon
164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 12, 2025

Project location map

980 Carvell Rd, Chapman, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.