Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 15, 2026 at 8:00 PM
Updated September 21, 2026
Demolition and site work for a clubhouse / community center in Cooper, Maine. Completed plans call for the demolition of a clubhouse / community center; and for site work for a clubhouse / community center.
The Town of Cooper is seeking contractor quotes for two projects at the Cooper Community Center. Quotes may be submitted for the partial demolition of the existing structure, replacement of the existing structure or both. The contractor shall provide all labor, materials, equipment, and supervision necessary to: Demolish the designated portion of the building down to grade. Remove all associated structural components, including: Foundations Exterior and interior walls Roof structure Floors and subfloors Disconnect and cap all utilities serving the demolition area. Protect and preserve the adjacent structure that will remain. Remove and legally dispose of all debris off-site. Restore the site to a safe, graded condition upon completion. This project consists of constructing a new one-story addition in the footprint of the previously demolished portion of the building. The new structure shall: Replace the removed two-story section with a single- story structure Integrate structurally and architecturally with the remaining building Be constructed on a reinforced concrete slab- on-grade foundation The finished addition must provide a weathertight, code-compliant, and fully functional space consistent with the existing facility.
Sub-Bidding
$30,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2026
October 30, 2026
425 Cooper Hwy, Cooper, ME
Related To This Project
Cooper, ME
Bid Date: Apr 30 2024
Cooper, ME
Bid Date: Jul 02 2022
Mount Vernon, ME
Bid Date: Oct 05 2026
Ellsworth, ME
--
Brunswick, ME
--
Andover, ME
Bid Date: Sep 29 2026
Madawaska, ME
Bid Date: Sep 17 2026
Madawaska, ME
Bid Date: Sep 15 2026
Boothbay, ME
Bid Date: Oct 07 2026
West Paris, ME
Bid Date: Sep 10 2026
Houlton, ME
Bid Date: Oct 06 2026
Augusta, ME
Bid Date: Sep 25 2026
Kittery, ME
Bid Date: Sep 08 2026
Milo, ME
Bid Date: Sep 16 2026
Houlton, ME
Bid Date: Sep 16 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
