BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2024 at 8:00 PM

Updated August 28, 2025

Demolition and site work for a service station / car wash facility in Cutler, Maine. Completed plans call for the demolition of a service station / car wash facility; and for site work for a service station / car wash facility.

The work includes all labor, material, equipment, transportation, supervision, and incidental related work to demolish three existing bulk tanks and associated piping in the bulk tank area at NSA Cutler in Cutler, Maine. It also includes the demo of the four transient fuel tanks and their corresponding dog houses covering the utility pits. A total of four new 50,000 gal tanks will be installed in the existing bulk tank area and four 20,000 gal tanks will be installed in the transient fuel area. There are 11 bid options. Bid option 1: Includes the demo of the bulk tank berm oil water separator. Bid option 2: Includes providing a 6 inch concrete slab on abandoned bulk tank foundation. Bid option 3: Includes the demo of cantilevered concrete pan at transient tank dog house. Bid option 4: Includes providing a reinforced membrane waterproofing system to building. Bid option 5: Includes providing concrete repairs inside transient utility tunnel - Crack Injection. Bid option 6: Includes providing concrete repairs inside transient utility tunnel - Type B Spall. Bid option 7: Includes transport 650 CY of excess soil offsite in lieu of grading excess soils around project site. Bid option 8: Includes mill and overlay of roadways around project area. Bid option 9: Includes Fuel oil delivery and tank filling upon completion of Phase 2. Bid option 10: Includes on site temporary fuel storage for fuel oil removed as part of Phase 2. Bid option 11: provides for the installation of bollards for transient tank parking lot. The project value of the requirement is more than $10,000,000.00. ALL REQUESTS FOR INFORMATION (RFI) ARE REQUESTED TO BE SUBMITTED NO LATER THAN 12 PM on 3 JULY 2024 Please forward any questions regarding this project in writing to both Matt Thomsen, email address: matthew.j.thomsen2.civ@us.navy.mil and Jon Erickson, email jonathan.p.erickson3.civ@us.navy.mil

Award

Service Station / Car Wash

$11,898,742.00

Public - Federal

Demolition, Site Work

50

20

54

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
5
Bidding Soon
191
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

August 19, 2024

Project location map

To Be Determined, Cutler, ME


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.