Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for a water / sewer project in Fort Kent, Maine. Completed plans call for site work for a water / sewer project.

Furnish materials and install two septic systems in the Town of Fort Kent. A portion of the work will be funded by the DEP Small Community Grant Program and the work will be subject to special requirements of the DEP. Each individual septic system will be awarded by separate contract. The septic systems need to be installed . The septic systems need to be installed by November 15, 2025. The project will be awarded to the lowest most responsive and responsible bidder upon project funding. The Town of Fort Kentis an Equal Opportunity Employer. For more information please call Cindy at 834-3507. The Town reserves the right to accept or reject any or all bids. Installation should be done during suitable weather and moisture conditions. Do not install during wet weather, saturated ground conditions, or below freezing temperatures. Remove trees and woody vegetation within 15 to 20 feet of the system. Bed septic tank in at least 6" of clean gravel. Seal holes and pipe openings to create watertight tank. Septic tank risers are required to assist in maintenance/inspection. If needed, contractor to size pump according to lift and run. Install check valve and high-water alarms in accordance with manufacturer's recommended installation. Distribution boxes (D-Box) to be set level and placed on firm surface. Protect D-Box from freezing with 2 inches of high-density rigid polystyrene insulation on the sides and top. D-Box fed from Pressure Line must be bottom feed. Do not allow effluent to surge towards cover or directly into distribution line. Either use one or two 90 fittings to direct inflow towards back corner or downward. Disposal field should be constructed either by hand, or with tracked equipment reaching from outside disposal field area (including fill extensions.) Do not operate wheeled equipment on disposal area or fill extension. All soils placed in disposal field and fill extensions must meet gradation requirements from Section 12 of CMR 241 Code. Remove all vegetation and organic matter within system and fill extension area, leaving as much original topsoil as possible. Scarify disposal area bottom and fill extension along contour, avoid smearing or compacting soil. Add Gravelly Coarse Sand to provide a minimum transitional horizon of 6 inches (unless otherwise noted) to improve percolation. Disposal bed distribution lines are to be level within 1 inch in 100 feet. o Finished grade of disposal field and 3-foot-wide shoulders to be 2-3%, fill extension to be max of 25% slope. o Divert any surface water from disposal area. Do not connect floor or roof drains to a septic system. o Establish grass over the top of the disposal fields as soon as possible. If installation takes place in the late fall and it is too late for grass to grow, provide a thick layer of hay mulch to protect the field. o Avoid traffic over any part of the disposal system. If traffic is expected over the Septic Tank, an H-20 rated tank must be used Locations- 147 South Perley Brook Road, 169 North Pérléy Brook Road

Post-Bid

Water / Sewer

$20,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
9
Bidding Soon
151
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

October 17, 2025

Project location map

Multiple Locations, Fort Kent, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.