BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2022 at 8:00 PM

Updated July 3, 2025

Site work and paving for a bridge / tunnel in Hanover, Maine. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

BRIDGE NO. 5506 The lowest responsive bidder must have completed, or successfully complete, a bridge prequalification, or project specific prequalification to be considered for the award of this contract. Description: Maine Federal Aid Project No. STP-1872(400) WIN 018724.00 Location: In Oxford County, Evans Brook Bridge over Evans Brook is located approximately 1.44 miles southerly of the Gilead town line. Scope of Work: Evans Brook bridge deck replacement plus other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Project Manager Jason Stetson at (207) 624-3431, use electronic RFI form or email questions to RFI- Contracts. MDOT a maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday} prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States posta] money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Laws, This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. This Contract is subject to all applicable State Laws. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Evans Brook Bridge Deck Replacement - Region 3 Please note: The Department will accept a facsimile of the bid bond: however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening, Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence.

Award

Bridges / Tunnels

$1,062,853.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
47
Bidding Soon
623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2022

October 24, 2022

Project location map

Multiple Locations, Hanover, ME


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.