BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2023 at 8:00 PM

Updated July 3, 2025

Site work and paving for a civil project in Lewiston, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

14-208-23 Questions and Requests for Information shall be submitted to Faith Thomas (fthomas@lewistonmaine.gov) on or before noon, February 14, 2023 The work for the CHAMPLAIN AVENUE WATER MAIN REPLACEMENT shall consist of, but not be limited to, the complete and satisfactory construction of installation of: -1,800 LF of 6" Dia. DI Water Main -660 LF of 3/4 " Copper Water Services -530 CY Aggregate Base (MDOT 703.06 Type A) -850 CY Aggregate Subbase (MDOT 703.06 Type D) -540 Ton of 12.5mm HMA Surface Course -720 Ton of 19mm HMA Base Course -6,300 SY of Pavement Removal Work will include the installation of a new water main and services within the entirety of Champlain Avenue, and ~180-ft of water main in Surry Lane, as indicated on the bid plans. The existing pavement within Champlain Avenue & Surry Lane will need to be removed and repaved with base & finish surfaces to the full street width. Temporary water services during construction will be required during new main installation. Coordination with the Water District for requisite shut-downs will be required No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of five percent (5%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work.

Award

Water / Sewer

$555,729.00

Public - City

Paving, Site Work

8

11

10

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
32
Bidding Soon
714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2023

March 24, 2023

Project location map

Champlain Ave, Lewiston, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.