BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2023 at 8:00 PM

Updated July 3, 2025

Site work for a water / sewer project in Lewiston, Maine. Design plans call for site work for a water / sewer project.

Engineering for this project is underway and is at the preliminary design phase. The project would include a new water transmission main from the lake to Main Street Pumping Station (or where ever the pumping station is located) with a new river crossing at the Auburn Boat Launch to Avon Street in Lewiston. Phase 1 would be to construct a new main on North River Road in Auburn from Center Street to the new river crossing. Phase 2 is the river crossing by directional drilling or dredging. Phase 3 is a new 24-inch main from Avon Street to the Main Street. Phase 4 is new transmission main on Main Street from Bates Street to the Main Street Pump Station. A new pump station near or on Avon Street would be feasible if the existing Main Street Pump Station ever needs to be replaced or moved. The last phase that is not included in this LCIP is to install a second transmission main from the lake to the river crossing. Costs shown here are high ranges for the various phases since the design process has not refined the alternatives, and for now are simply prorated. As March 20, 2023, this project is currently in the FY 2024 - 2028 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$5,500,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
37
Bidding Soon
749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

Multiple Locations, Lewiston, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.