Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 7, 2025 at 8:00 PM
Updated July 3, 2025
Renovation of an educational facility in Milford, Maine. Completed plans call for the renovation of a 5,624-square-foot educational facility.
K-8, School Gym Floor Relining and Refinishing . Introduction Dr. Lewis S. Libby Elementary School is requesting proposals for the relining and refinishing of the gymnasium floor located at 13 School St., Milford, ME 04461. This project aims to restore and enhance the gym floor to improve its aesthetic appeal, safety, and usability for school events, sports activities, and community functions. Please include information on how long the new finish will last and if it can be refinished again. Additionally, if able, submit an alternative quote for an appropriate alternative flooring material to replace the flooring that is currently in place. This should be submitted as a separate proposal. 2. Scope of Work The scope of work includes, but is not limited to, the following tasks: Approximate Square Footage: 5,624 sq ft Preparation: Remove bleachers, all thresholds, and baseboard Relining the Gym Floor: Repaint lines for basketball, volleyball, pickle ball etc. in compliance with current regulations and specifications. Additional lines may be discussed during your site visit. Refinishing the Floor: Sanding, re-coating, and refinishing the wood floor to restore its appearance and functionality, ensuring a smooth, durable finish suitable for athletic use. Floor Preparation: Preparation of the existing floor surface, including cleaning, sanding, and repairs of any damaged or worn areas before refinishing. Safety Considerations: Ensure that all materials used are non-toxic and meet any applicable safety standards. Permits: Acquiring any necessary permits at the local, state, or federal level for the project. Finishing: Install new thresholds, new baseboards, and reinstall bleachers Timeline: The work must be completed within [insert timeframe, e.g., 2 weeks] from the project start date. Specific start and end dates should be outlined in the proposal. Post-Project Clean-Up: Removal of any debris and final cleaning of the gymnasium floor. 3. Proposal Requirements All proposals must include the following: Company Profile: Include a brief overview of your company, including experience in gym floor refinishing, relevant certifications, and references. Detailed Plan: A step-by-step description of the proposed work, including timelines and any necessary preparation steps. Cost Breakdown: A clear itemized breakdown of the costs for labor, materials, and any additional services (e.g., repairs, special coatings). Warranty Information: A description of the warranty for both workmanship and materials. Completion Timeline: Estimated start date, duration of the project, and a proposed completion date. Insurance and Licensing: Proof of appropriate insurance coverage, business licenses, and any required bonding. 4. Evaluation Criteria Proposals will be evaluated based on the following criteria: Experience and qualifications of the contractor Quality and clarity of the proposed work plan Cost competitiveness and transparency References and reputation in the industry Ability to meet the proposed timeline Contact Information: Name: Trish Clark Title: Superintendent/Principal Email: tclark@milfordsd.org Additional information can be found here online. Please use the above email address if you have any questions, need additional details, or would like to schedule a site visit. The school reserves the right to reject any or all proposals. The awarded contractor will be required to sign a contract outlining the terms of the project. The school may request additional information or interviews before making a final decision.
Post-Bid
Educational
$220,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 5, 2025
13 School St, Milford, ME
Related To This Project
Milford, ME
Bid Date: Jun 24 2024
Milford, ME
Bid Date: Jun 06 2023
Milford, ME
Bid Date: Apr 04 2023
Milford, ME
Bid Date: Apr 04 2023
Milford, ME
Bid Date: Apr 04 2023
Milford, ME
Bid Date: Aug 17 2022
Milford, ME
Bid Date: Apr 29 2022
Milford, ME
Bid Date: Nov 01 2022
Milford, ME
Bid Date: Nov 01 2022
Poland, ME
Bid Date: Apr 11 2025
Boothbay Harbor, ME
Bid Date: Mar 21 2025
Avon, ME
Bid Date: Oct 16 2018
North Haven, ME
Bid Date: Mar 27 2025
Kittery Point, ME
Bid Date: Apr 02 2025
Bridgton, ME
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
