Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published November 25, 2026 at 7:00 PM
Updated November 29, 2026
Demolition, site work, paving, new construction and renovation of a mixed-use development in Portland, Maine. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Question Deadline 11/23/2026 at 12:00 PM ET All questions shall be directed in writing ONLY to the Purchasing Office Purchasing Rm . 103, 389 Congress St., Portland ME 04101. , or email slchapin@portlandmaine.gov. Responses from the City that substantially alter this bid will be issued in the form of a written addendum to all bid holders registered in the Purchasing Office. Oral explanations or interpretations given before the award of the contract will not be binding. Installation of storm drain and sanitary sewer pipe, precast catch basins and manholes, installation of nutrient separating baffle box and StormTrees, brick sidewalk with vertical granite curb, ADA sidewalk ramps, road trench restoration, water main replacement, installation of mini-roundabout including signals, lighting, islands, and associated roadway reconstruction. Location: The Center Street Sewer Separation & Gorham's Corner Mini-Roundabout project is located along sections of Center, Free, High, Pleasant, Fore, York, and Danforth Street. The Gorham's Corner miniroundabout is proposed at the intersection of Center, Pleasant, York, and Fore Street. Outline of Work: The project includes, but is not limited to the following items: 1. Installation of approximately 1,110 linear feet of 12-24-inch diameter storm drain pipe, 550 linear feet of 12-18-inch diameter sanitary sewer pipe, precast catch basins and manholes, reconfiguration of existing drainage manhole on Commercial Street to accept separated storm drain from Center Street, nutrient separating baffle box, StormTrees, brick sidewalk with vertical granite curb, thirteen ( 13) ADA sidewalk ramps, associated roadway trench restoration, traffic control and other incidental work including support of existing underground utilities including water, natural gas, electrical, and telecommunications utilities during excavations. 2. Pleasant Street partial roadway reconstruction from Center Street to South Street, brick sidewalk with remove and reset vertical granite curb, sewer lateral location services and coordination with the City, and work included in scope item 1 above. 3. York Street and Danforth Street intersection realignment, including two rain gardens that connect to the proposed storm drain included in scope item 1 above. 4. Gorham's Corner mini-roundabout construction at the Center, Pleasant, York, and Fore Street intersection including abandonment, removal, and dispose of existing signals and associated equipment, pedestrian lighting, full depth roadway reconstruction, traversable concrete splitter and center islands with slipform concrete curb, brick sidewalk with vertical granite curb, striping, signage, and work included in scope item 1 above. 5. Center Street brick sidewalk reconstruction and ADA improvements from Congress Street to Spring Street including seven (7) ADA sidewalk ramps, granite monument adjustments/relocation, one tree well, driveway adjustments, signage, and striping. 6. Replace approximately 940 linear feet of 8-12-inch diameter water main on Center, York, and Pleasant Street, water service and fire hydrant renewal, trench restorations, and associated construction as indicated on the plans and specifications including maintenance of temporary water service during construction. Relocation/reconnection of existing water service laterals which may conflict with work. This work is included under a separate contract with the Portland Water District (PWD). Refer to Appendix D for Portland Water District specifications. Three (3) bid forms are included in the contract documents, each corresponding to the following scope of work: a. Bid Form #1 - City of Portland Transportation: Includes all roadway, sidewalk, lighting, signage, striping work associated with the Gorham's Corner Mini-Roundabout inside the intersection full depth reconstruction limits shown on the plans (sawcut lines on each road leg). Portland Water District work and City of Portland Water Resource storm drain, sewer, and stormwater treatment work are not included. i. Bid Form #1 includes three lump sum items . Traffic Control, Erosion and Sedimentation Control , and Mobilization - that apply to the full scope of work represented across all three bid forms. Contractors shall price these lump sum items to encompass the combined work of all three bid forms. b. Bid Form #2 - City of Portland Water Resource: includes all roadway, sidewalk, and utility work outside of the Gorham's Corner Mini-Roundabout full depth reconstruction limits shown on the plans (sawcut lines on each road leg). PWD associated work is not included. C. Bid Form #3 - Portland Water District: includes all water main, trench restoration, and all other associated water work for the entire project area.
GC Bidding
$2,000,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2026
March 1, 2027
Multiple Locations, Portland, ME
Related To This Project
Portland, ME
Bid Date: Dec 10 2026
Portland, ME
Bid Date: Dec 15 2026
Portland, ME
Bid Date: Dec 16 2026
Portland, ME
Bid Date: Nov 17 2026
Portland, ME
Bid Date: Dec 03 2026
Portland, ME
Bid Date: Nov 16 2026
Portland, ME
Bid Date: Nov 19 2026
Portland, ME
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed