BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Windham, Maine. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of the existing bridge with a steel superstructure, concrete deck with integral wearing surface, concrete abutments, replacing existing guardrails, approach work, and other incidental work. Description: Replacement of Varney Bridge in Windham, Maine. Location: The project is located in Brunswick, in Cumberland County. Outline of Work: The work to be done under this contract consists of the replacement of the existing bridge with a steel superstructure, concrete deck with concrete integral wearing surface, concrete abutments, replacing existing guardrails, approach work, and other incidental work. For general information regarding Bidding and Contracting procedures, contact Calderwood Engineering at (207) 737-2007. For general information regarding Bidding and Contracting procedures, contact Calderwood Engineering at (207) 737-2007. Questions received after 12:00 noon of Wednesday prior to bid date will not be answered. Bidders shall not contact any other Town staff for clarification of Contract provisions, and the Town will not be responsible for any interpretations so obtained.. One copy of each Bid is required and must be made upon Contract Agreement Offer and Award forms provided by Town of Windham. Each Bid must be accompanied by a bid bond at 5% of the bid amount payable to Treasurer, Town of Windham as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. The right is hereby reserved to Town of Windham to accept or reject any or all bids. ME DOT - Replacement of the Existing Bridge With a Steel Superstructure - William Knight Rd QA date - 11-19-2025 12:00 PM For general information regarding Bidding and Contracting procedures, contact Calderwood Engineering at (207) 737-2007. Questions received after 12:00 noon of Wednesday prior to bid date will not be answered. Bidders shall not contact any other Town staff for clarification of Contract provisions, and the Town will not be responsible for any interpretations so obtained.

Award

Bridges / Tunnels

$1,214,500.00

Public - City

Demolition, New Construction, Paving, Site Work

26

11

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
57
Bidding Soon
969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2025

December 26, 2025

Project location map

William Knight Rd, Windham, ME

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.