BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2024 at 8:00 PM

Updated July 3, 2025

Site work for a water / sewer project in York, Maine. Completed plans call for site work for a water / sewer project.

Questions regarding this Request for Proposal should be directed to Forrest Brenske, Harbor Master, York Police Department, 9 Hannaford Drive, York, Maine 03909, or email Forrest at harbormaster@yorkmaine.org. Each Proposer is required to state in the Proposal: 1. Its name, principals, mailing address, and telephone number; 2. The name, telephone number, and email address for its Contact Person; 3. The names, titles, mailing address, and telephone numbers for all subcontractors that will be used on this project; and 4. A statement that no person acting for or employed by the Town is directly or indirectly interested in the Proposal or any agreement which may be entered into to which the Proposal relates or in any portion of the profits here from. Questions regarding this Request for Proposal should be directed to Forrest Brenske, Harbor Master, York Police Department, 9 Hannaford Drive, York, Maine 03909, or email Forrest at harbormaster@yorkmaine.org. SCOPE OF SERVICES: All work to be performed to NEC, NFPA70E, and NEC Article 555.30 standards. Task 1- Replace all existing wiring with tinned XHHW, XHHW-2, or RHW. Color coding to be per NEPA 70E. All wiring to be numbered at each end of the wire. Relocate all cable splices at least 24" above the pier surface per NEC Article 555.30 or 15 feet above MLW (0.0). All cable splices to have heat shrink covers. Task 2- Replace Main Electrical Panel with a Stainless Steel NEMA 4X enclosure. Replace all circuit breakers with heavy duty, wet environment breakers. Task 3- Install heavy duty, wet environment computerized timer for turning on and off the pier lights. Task 4- Inspect and make waterproof all existing Junction Boxes. Task 5- Replace Washdown Pump Boxes and Switches with heavy duty, wet environment switches and Stainless Steel boxes. Task 6- Replace Winch Pump Boxes and Switches with heavy duty, wet environment switches and Stainless Steel boxes. Task 7- Replace all existing outlets with heavy duty, wet environment outlets. Task 8-Provide the Town a Detailed Wiring Schematic. 6 bound copies and 1 PDF. All proposals shall conform with the following schedule to complete proposed work: 1. Begin Project: May 1st, 2024 2. Finish Project: June 15th, 2024 The Town reserves the right to waive any informalities in Proposals, to accept any Proposal, and to reject any or all Proposals, should it be deemed in the best interest of the Town to do so. Proposals may be held by the Town for a period not to exceed thirty (30) days from the date of the opening of Proposals for the purpose of reviewing proposals and investigating the qualifications of the Proposers prior to the award of a contract.

Bid Results

Water / Sewer

$20,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
373
Active Projects
164
Bidding Soon
3,002
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.