EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Stockton, California. Completed plans call for site work for a playground / park / athletic field.

The successful bidder shall be required to furnish a Labor and Material Bond and a Faithful Performance Bond, each in the sum of one hundred percent (100%) of the contract price. Said bonds shall be furnished by a company authorized to issue surety bonds in the State of California. On official forms furnished by City, said bonds shall be executed by the surety and contractor before or concurrently with the signing of the contract. For questions ab For questions about this project, please contact Jeniffer Morfin at (209) 937-8676 or email Jeniffer.Morfin@stocktonca.gov. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required SCOPE OF SERVICES Scope of Services includes, but is not limited to: 1. Assess needs and design criteria with City's parks maintenance team. 2. Provide a consistent project design team through the full length of the design process. Substitutions need to be submitted in writing to the City and must be approved by the City. 3. Provide schematic drawings, colored elevations, colored perspective, and other suitable material depicting the components to be evaluated. 4. Apply value engineering/analysis to alternatives including advice on "constructability" and "vandal-resistant" decisions. Provide information on the trade-offs between alternatives as to the initial costs, life cycle costs, and construction schedule. 5. Design development and installation document stages of the project. Provide feedback on the budget, schedule, and make recommendations to the City. 6. Ensure the equipment fits within the site for all use zones. 7. Arrange for equipment to be delivered on site by installer. Secure equipment if delivered early. 8. Secure the work site with 6' temporary chain link fencing and warning signs during installation and until final safety certification is received and approved by City The City of Stockton Public Works Department is requesting proposals from qualified firms to remove existing play equipment and provide and install a multi-component, modular playground structure at Loch Lomond Park, 8477 N. El Dorado St, Stockton, CA 95210. Vendors are invited to submit proposals for this playground. The selection criteria listed within this RFP shall be used to measure how well each vendor has met the desired requirements and qualifications. The award will be based on evaluation of all selection criteria. The City will conduct negotiations with the highest ranked firm based upon the selection criteria as outlined in this RFP. MANDATORY JOB WALK: N/A Question Deadline 03/04/2025 at 4:00 PM PT Any question or request for clarification shall be submitted in writing to: Jeniffer.Morfin@stocktonca.gov. the City Council reserves the right to reject any and all proposals and to re-advertise for proposals or to provide for the work to be done by the City of Stockton.

GC Bidding

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
118
Bidding Soon
1,823
All Active Projects
872
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2025

April 18, 2025

img_map_placeholder

Mac Duff Ave & Kiltie Way, Stockton, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Playground at Loch Lomond Park

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.