Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 2, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a municipal facility in Fort Wayne, Indiana. Completed plans call for the renovation of a municipal facility.
Allen County Keystone Building Condensing Units Replacement WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Prior to demolition, perform airflow testing of four (4) air handling units. 2. Remove existing evaporator coils at each of the four (4) air handling units. 3. Remove four (4) condensing units located on the roof, one serving each air handling unit. 4. Remove refrigerant piping connecting condensing unit and indoor air handling unit complete. 5. Remove starter and disconnects serving condensing units on the roof. 6. Units which have been removed shall be removed from HVAC controls front end as well. 7. Install new evaporator coils at each of the four (4) indoor air handling units. 8. Install new condensing units serving each of the air handling units on the roof. 9. New refrigerant piping shall be installed between the indoor air handling units and outdoor condensing units. 10. Interface new units with existing building management system serving the facility. 11. Conduct testing and balancing of new assembly and rebalance to values obtained as part of preconstruction testing and balancing. 12. Provide all equipment testing, inspection start-up and submit associated documents including testing and inspection reports and startup checklists 13. Provide all operation and maintenance manuals, as-built record documents and other specified closeout documentation. 14. Contractor shall be fully responsible for all safety measures required throughout the project, including compliance with all OSHA safety standards. 15. Submit warranties on all equipment, including a one-year warranty for overall project. All warranties shall begin on date of substantial completion, regardless of how manufacturer’s standard warranty reads. 16. Provide training to local maintenance staff with the help of factory authorized representative as a part of the project. 17. Other work shall be indicated in contract documents.
Bid Results
Municipal
$421,015.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 05 - Metals
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
May 1, 2025
602 S Calhoun St, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Mar 26 2025
Fort Wayne, IN
Bid Date: Mar 20 2025
Fort Wayne, IN
Bid Date: Apr 03 2025
Fort Wayne, IN
--
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Mar 26 2025
Fort Wayne, IN
Bid Date: Mar 27 2025
Fort Wayne, IN
Bid Date: Apr 08 2025
Fort Wayne, IN
Bid Date: Mar 26 2025
Fort Wayne, IN
Bid Date: Mar 27 2025
Fort Wayne, IN
Bid Date: Mar 20 2025
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Mar 10 2025
Fort Wayne, IN
Bid Date: Mar 18 2025
Fort Wayne, IN
Bid Date: Mar 11 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.