Published April 2, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Fort Wayne, Indiana. Completed plans call for the renovation of a municipal facility.

Allen County Keystone Building Condensing Units Replacement WORK COVERED BY CONTRACT DOCUMENTS A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Prior to demolition, perform airflow testing of four (4) air handling units. 2. Remove existing evaporator coils at each of the four (4) air handling units. 3. Remove four (4) condensing units located on the roof, one serving each air handling unit. 4. Remove refrigerant piping connecting condensing unit and indoor air handling unit complete. 5. Remove starter and disconnects serving condensing units on the roof. 6. Units which have been removed shall be removed from HVAC controls front end as well. 7. Install new evaporator coils at each of the four (4) indoor air handling units. 8. Install new condensing units serving each of the air handling units on the roof. 9. New refrigerant piping shall be installed between the indoor air handling units and outdoor condensing units. 10. Interface new units with existing building management system serving the facility. 11. Conduct testing and balancing of new assembly and rebalance to values obtained as part of preconstruction testing and balancing. 12. Provide all equipment testing, inspection start-up and submit associated documents including testing and inspection reports and startup checklists 13. Provide all operation and maintenance manuals, as-built record documents and other specified closeout documentation. 14. Contractor shall be fully responsible for all safety measures required throughout the project, including compliance with all OSHA safety standards. 15. Submit warranties on all equipment, including a one-year warranty for overall project. All warranties shall begin on date of substantial completion, regardless of how manufacturer’s standard warranty reads. 16. Provide training to local maintenance staff with the help of factory authorized representative as a part of the project. 17. Other work shall be indicated in contract documents.

Bid Results

Municipal

$421,015.00

Public - County

Renovation

10

17

2

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Decking, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
38
Bidding Soon
569
All Active Projects
256
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2025

May 1, 2025

img_map_placeholder

602 S Calhoun St, Fort Wayne, IN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Condensing Units Replacement Allen County Keystone Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.