Renovation of a municipal facility in Richmond, Virginia. Working plans call for the renovation of a municipal facility.

A. Contractor shall achieve Final Completion of the Work within sixty (60) days of Notice of Award of the Contract. Final Completion is full and complete performance of all Work in accordance with the Contract, including completion of items identified on punch lists, completion of all training, and submission of all warranty documents, manuals, and other documentation required by the Contract. B. The Contractor shall contact the SCC within seven (7) days of contract award to provide a suggested project schedule for SCC review and approval. C. The Contractor shall schedule any work that will disrupt server room operations to occur only on the following Saturdays between 7:00 AM and 9:00 AM: a. March 15, 2025 b. March 22, 2025 c. April 12, 2025 d. April 19, 2025 D. The Contractor shall include all planned or potential disruptions to server room operations in its schedule. E. The Contractor shall adhere to all applicable safety codes, standards, laws, and regulations. F. In addition to the pre-bid site visit, the Contractor shall conduct at least one preinstallation site survey to verify field conditions and finalize installation details. G. The Contractor shall furnish a EPOC that complies with all requirements of the Contract. The work shall be governed by the following as applicable: a. Local electrical and fire safety codes b. National Electric Code (NEC) 2017 or latest edition c. National Fire Protection Association (NFPA) 70-A & 101 (2018) or latest edition d. Virginia Uniform Statewide Building Code (VUSBC) 2018 or latest edition e. Virginia Occupational Safety and Health Administration (VOSHA) 1910 and 1926 f. Exhibit A, Specification Section 16920 – Emergency Power Off Controller g. Exhibit B, 7 th Floor Server Room Markup, H. The Contractor shall have a Virginia contractor’s license. I. The Contractor shall install and run all wiring in conduit. J. The Contractor shall coordinate, as necessary or at the request of the SCC, with manufacturers of potentially impacted equipment and systems, including, but not limited to, HVAC and Clean Agent System, Dry Pipe Sprinkler System and uninterrupted power supply, to ensure seamless integration. K. The Contractor shall label all EPOC-related components and provide updated electrical diagrams. L. The Contractor shall test the EPOC post-installation to confirm functionality and compliance. M. The Contractor shall provide, at a minimum, two hours of onsite training to the SCC Facilities Manager on the proper use and maintenance of the EPOC. N. The Contractor shall provide to the SCC Facilities Manager with each piece of equipment an operations and maintenance manual with wiring diagrams and parts list. O. The Contractor shall provide to the SPOC with each piece of equipment a copy of all warrantie

Final Planning

Municipal

$150,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
37
Bidding Soon
1,006
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

October 1, 2025

img_map_placeholder

1300 E Main St, Richmond, VA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Data Center Emergency Power Off Controller Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.