BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2019 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a mixed-use development in Ames, Iowa. Completed plans call for the construction of a 425,000-square-foot educational facility.

The work includes construction of a New High School located on the site of the existing High School. The project includes academic spaces, performing arts center, indoor gymnasiums and athletic facilities, swimming pool, food service, outdoor practice fields, and site development. Construction activities include, but are not limited to excavation, concrete footings and foundations, concrete slab-on-grade, precast concrete, masonry, structural steel framing, thermoplastic membrane roofing, metal joists and deck, aluminum composite panels, aluminum curtainwall, finish carpentry, interior wood and hollow metal doors, interior and exterior aluminum storefront framing, windows, steel stud and gypsum board partitions, acoustical panel ceilings, rough carpentry and sheathing, thermal insulation, carpet, terrazzo, tile, resilient flooring, painting, specialties, window treatments, laboratory casework, architectural wood casework, theatrical systems and equipment, athletic flooring and equipment swimming pool and equipment, elevators and lifts. Mechanical systems include HVAC distribution and equipment, controls, plumbing systems, fire suppression systems, a geothermal well field and site utility connections. Electrical systems include lighting, electrical distribution, switch gear and connection to the public utilities along with communications/data, security and fire alarm systems. Site development includes selective site demolition, earthwork, subgrade and sub-base, erosion and sediment control, pavement and sidewalks, seeding, plantings, water distribution, sanitary sewerage, and storm drainage. The demolition of the existing high school will follow the completion of the new high school. Site restoration activities constructed on the site of the existing high school after demolition include earthwork, erosion and sediment control, PCC pavement and sidewalks, seeding, plantings, trench excavation and backfill, water distribution, sanitary sewerage, and storm drainage, construction of athletic fields, greenhouse, outdoor classroom structure. BP# 31-1 Earthwork BP# 23-2 Geothermal (Special Equipment)

Award

Educational

$109,000,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
100
Bidding Soon
1,189
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2019

June 1, 2019

Project location map

1801 Ridgewood Ave, Ames, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.