BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and addition to an educational facility in Cleveland, Minnesota. Completed plans call for the addition of a educational facility.

The proposed addition to the Cleveland School contains three major building areas that total over 65,429 sf of space. The individual areas have been broken out for a program description as follows: Multi-Purpose Lobby Area / Circulation: This area is designed to be a dual-purpose space and will be 17,946 sf in size. We are doubling up on the functions of this area which will serve as the student cafeteria with seating for over 250 students. This space will also serve as a study area, flexible learning space, and after school program space. This open space is required by the building code, to also function as gathering space for the larger sporting events that take place within the gymnasium functions of the school. Adjacent to the Lobby/Commons area will also contain a 4,354 sf kitchen. The kitchen will also serve a special morning meal program. This level of the building also includes a Band Room and band storage room that together equal 3,470 sf in size. Gymnasium/Multipurpose: A 26,938 sf two-stage multipurpose gymnasium, with 600 seats is included in the project. This multipurpose addition will also include locker rooms, storage for equipment, coach offices, and weight training area in the basement areas of the building and will be accessible to the football field. Class Rooms: 13,400 sf of actual classrooms (20,545 sf including corridors) are included and will accommodate specialized spaces for tech lab and STEM lab space. The bond proposal consists of two questions: Question 1 ($14.4 million) will address maintenance needs (such as a roof replacement, HVAC and code improvements and safety and security improvements, etc.) as well as the construction of classrooms, a cafeteria, a STEM lab and an Ag/Tech lab. Question 2 ($5 million) consists of construction and equipping of a gymnasium, locker rooms, mechanical room and a weight room. As of May 7, 2019, construction is scheduled to start May 2019. Construction is tentatively scheduled for completion in July 2020.

Award

Educational

$19,660,958.00

Public - City

Addition, New Construction, Site Work

158

24

15

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
35
Bidding Soon
754
All Active Projects
359
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2019

img_map_placeholder

400 6th St, Cleveland, MN

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.