Published April 17, 2021 at 8:00 PM

Updated January 31, 2025

Site work, paving and new construction of a mixed-use development in Severn, Maryland. Completed plans call for the construction of a 83,840-square-foot educational facility; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construction of a new two-story building including a gymnasium, cafeteria, kitchen, mechanical room, music classrooms, administration, after-care multi-purpose room, classrooms, media center, and associated spaces including partitions, finishes, doors and frames, mechanical, plumbing, fire-protection, and electrical systems.. Existing building and site elements to be demolished in its entirety. Site work to include new bus loop, parking lots and driveways, new playgrounds, new play fields and other associated site improvements. Bid #21CN-146,2A SITEWORK Bid #21CN-147, 3A CONCRETE Bid #21CN-148, 4A MASONRY Bid #21CN-149, 5A STRUCTURAL STEEL Bid #21CN-150, 6A GENERAL WORKS Bid #21CN-151, 7A ROOFING Bid #21CN-152, 8A WINDOWS Bid #21CN-153, 9A GWB AND CEILINGS AND PAINTING Bid #21CN-197, 9B FLOORING Bid #21CN-154,11A FOOD SERVICE EQUIPMENT Bid #21CN-156,15A MECANICAL Bid #21CN-157,16A ELECTRICAL The Work shall be conducted in 2 phases, with substantial completion at the completion of the final phase: 1. Phase 1: Construction of new building. 2. Phase 2: Demolition of existing building and completion of parking, bus loop, and associated site features. 3. The Construction Manager and Anne Arundel County Public Schools shall provide moving services as required: The project Substantial Completion date shall be no later than the following: Phase 1 (New Building and associated site work): May 1, 2023 Phase 2 (Remove Existing Building and associated site work): December 1, 2023 Liquidated Damages shall be $1,500.00 per calendar day due the Owner after expiration of the contract time for substantial completion. All Liquidated damages shall be assessed in accordance with the Contract Documents for this project. MBE goals set at 20% and above will have sub-goals of 8% African American and 11% Women-Owned. The Sub-goals are not applicable to Divisions 4A, 5A, 6A, and 8A Bid Result Sitework Comer Construction-$6,822,490 Concrete Chevy Chase Contractors-$1,030,236 Structural Steel Sibel Ayse Halac -$2,350,000 General Brawner Builders Inc-$2,759,190 Windows A & S Unlimited Construction-$798,000 Flooring Atlascopco Construction-$476,000 Food Service 11400 Inc-$261,500 Mechanical Rommel Cranston Construction-$5,579,000 Electrical Action Electrical-$3,265,000

Award

Educational

$6,891,643.00

Public - County

New Construction, Paving, Site Work

274

43

168

10

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
536
Active Projects
202
Bidding Soon
3,481
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2021

April 19, 2021

Project location map

7967 Quarterfield Rd, Severn, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.