BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 30, 2019 at 7:00 PM

Updated August 2, 2026

Site work and paving for a road / highway in Anchorage, Alaska. Completed plans call for paving for a road / highway; and for site work for a road / highway.

As of December 30, 2019, this project is under construction. ****See Tentative Solicitation Date and Tentative Completion Date**** PROJECT: AK FS CNF 1015(1), Russian River Campground Access, Phase I, Chugach National Forest, Kenai Peninsula Borough, Alaska LOCATION: Approximately 100 miles S of Anchorage, Alaska. WORK: This project consists of grading, paving, permanent traffic control, contact station, and other small items of work. LENGTH: 0.5 Miles TENTATIVE COMPLETION DATE: TBD TENTATIVE SOLICITATION DATE: Fall 2017 ESTIMATED PRICE RANGE: Between $2 million and $3 million. THIS SOLICITATION IS OFFERED AS A HUBZONE SMALL BUSINESS SET ASIDE. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. Registering at ADD TO WATCHLIST box insures notification when solicitation documents are posted. When solicitation documents are issued, the INVITATION FOR BIDS/REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. This paragraph announces possible financing available to small businesses. The three types of businesses that are eligible to receive a loan through this program are: (1) Firms that have received DBE certification from a state or local transportation agency; (2) Eligible small business firms; and (3) Firms that have received a disability rating by the Veteran's Administration and have certified themselves as a SDVOSB. Start-up businesses are not eligible to receive a STLP line of credit and should contact the SBA for information about other possible forms of financial assistance. (NOTE - This paragraph does not reserve this solicitation for these types of business): The Department of Transportation's (DOT) Short-Term Lending Program (STLP) offers working capital financing in the form of lines of credit to finance accounts receivable for transportation related contracts. The Maximum line of credit is $750,000. The STLP loan has a variable rate, which is connected to the prime rate. For more information see: http://www.dot.gov/osdbu/financial-assistance/short-term-lending-program . Contracting Office Address: 610 East Fifth Street Vancouver, Washington 98661-3801 Place of Performance: PROJECT IS LOCATED approximately 100 miles S of Anchorage, Alaska. Alaska . United States Primary Point of Contact.: Contracts G. Office, Western Federal Lands Highway Division WFL.Contracts@dot.gov Phone: (360)619-7520 Fax: (360)619-7932 Owner restrictions prohibit us from posting the bidding documents for this project. To obtain documents, please contact the owner or bidding GC’s.

Under Construction

$1,330,655.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
10
Bidding Soon
236
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2017

March 1, 2018

Project location map

To Be Determined, Anchorage, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.