Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, new construction and renovation of a mixed-use development in San Francisco, California. Design plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; and for the construction of a 8,000-square-foot, two-story above grade clubhouse / community center.
As of June 14, 2024, this project is in design. An architect has been selected. Information on the general contractor has not been released. Construction is not expected to begin until early 2025. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *The closed solicitation has been included below for reference: The San Francisco Recreation and Park Department, in partnership with the San Francisco Planning Department, is undertaking a renovation of Portsmouth Square and the surrounding area, to be funded by Transit Center Impact Fee funds allocated for Chinatown neighborhood park improvements. The project is part of a two-phased project featuring an initial Planning Phase and a subsequent Design Phase. This RFP is for consultant services in the Design Phase only. The Planning Phase has already been completed, and consisted of an existing condition and feasibility analysis of Portsmouth Square and the surrounding streets. The site data, program analysis, and project recommendations from this first phase are documented in the Portsmouth Square Area Existing Conditions and Feasibility Report, available for download with this proposal at the website listed in Section I.1 (Announcement). This Design Phase will define the project scope and budget, conduct a broad community outreach process, develop a concept design, produce a conceptual design report, and obtain necessary regulatory approvals. The project will then continue through design development, construction documentation, and construction administration once funding becomes available. The project will consist of the renovation and/or reconfiguration of all existing park features including plazas, children’s play areas, buildings, pedestrian bridge, landscaping, adjacent streetscape and Page 5 associated site work. The parking garage is not included in the scope of work. The consultant team will be responsible for leading a comprehensive community and stakeholder outreach process which will ultimately determine the extent of the final program and scope. The outreach process will need to address and balance the sometimes disparate programmatic needs of diverse and engaged stakeholders, including park users, neighbors, community groups, local businesses, and RPD operations and maintenance staff. As the park is located in San Francisco’s celebrated Chinatown neighborhood, the consultant team will need to conduct outreach in English, Mandarin, and Cantonese languages. The park design should also be reflective of the cultural significance of the neighborhood, and address programmatic challenges unique to Chinatown.
Design
Playgrounds / Parks / Athletic Fields
$66,000,000.00
Public - City
New Construction, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2025
745 Kearny St, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Aug 31 2022
San Francisco, CA
Bid Date: Sep 07 2022
San Francisco, CA
Bid Date: Oct 05 2022
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 16 2022
San Francisco, CA
Bid Date: Oct 30 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Oct 05 2022
San Francisco, CA
Bid Date: Oct 06 2022
San Francisco, CA
Bid Date: Nov 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.