BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2024 at 7:00 PM

Updated March 2, 2024

Site work, paving and new construction of a mixed-use development in Stevens Point, Wisconsin. Completed plans call for the construction of a 133,100-square-foot, two-story above grade educational facility; and for site work for a educational facility.

As of March 1, 2024, the client is working on the contract and it will most likely will be awarded to the low bidder. Construction is expected to start in April 2024 with completion in December 2025. The below solicitation is for historical purposes: This project will construct 133,100 GSF of shared activity space for student health and wellness programs to address inadequacies and deficiencies in existing facilities. A significant portion of the space will include a four-court gymnasium with an indoor jogging track; fitness spaces including cardio, strength, and group fitness; locker rooms and offices for staff; and support space for Outdoor Edventures trips and clinics. The center will also include space for the Student Health Service (SHS), the Counseling Center, and the University Child Learning and Care Center (UCLCC). The new building's design will encourage student interaction and reflect the university's Healthy Communities Initiative. The building will be constructed on the current northeast quadrant soccer field, and new outdoor fields for soccer, track, rugby, softball, and football practice will be added. The soccer, rugby, and football practice fields will be artificial turf, while the others will be natural grass. The central campus utilities capacities are sufficient to provide heating and cooling to the new facility, however, underground utility extensions to the new facility will be required. Note: The Department of Administration has implemented new security procedures for the building located at 101 East Wilson Street, Madison, WI. Please allow time to move through security on the first floor before delivering your submittal to the 7th Floor Reception Desk.

Bid Results

Educational

$32,900,000.00

Public - State/Provincial

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
31
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2024

Project location map

2100 Main St, Stevens Point, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.