BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Warrenton, Virginia. Working plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of May 8, 2024, a building permit application has been submitted for review. A firm timeline for construction and bidding has not been decided yet. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *The closed solicitation has been included below for reference: The purpose of this Request for Proposal (RFP) is to obtain a contract through competitive negotiation for the services of a qualified professional engineering firm to provide architectural and engineering services for the Expansion and Renovation of Taylor Middle School, located in Warrenton, Virginia. All services shall be provided in accordance with the specifications contained herein and attached hereto. This solicitation is issued by the Fauquier County Government Procurement Division on behalf of the Fauquier County School Board, a political subdivision of the Commonwealth of Virginia, herein referred to for convenience as "Owner" The Owner shall negotiate and agree upon the complete length of this contract term with the successful Firm, however, the Owner anticipates the design phase of this contract to be complete within one (1) year of award, and the construction phase, within eighteen (18) months or more from the award of a construction contract All Inquiries for Information Should Be Directed to: Kathy H. Stanley, NIGP-CPP, CPPB, Senior Buyer, e-mail: kathy.stanley@fauquiercounty.gov If bid bonds were tendered with the bid, the Owner may exercise its right of collection. performance bond or insurance protection required by this contract The Owner reserves the right to cancel or reject any or all proposals, to waive any informalities in any proposal received and to negotiate and award contracts deemed to be in the Owner's best interest. The method of Contractor Selection has not been Determined at this time.

Final Planning

Educational

$56,600,000.00

Public - County

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
77
Bidding Soon
1,887
All Active Projects
750
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

img_map_placeholder

350 E Shirley Ave, Warrenton, VA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.