Site work and renovation of a civil project in Nashville, Tennessee. Completed plans call for site work for a water / sewer project; water / sewer project; and for the renovation of a water / sewer project.

Project Summary The Mill Creek Trunk Improvements and Equalization Facility project consists of the design of approximately 13,800 linear feet of large diameter, wet weather gravity sewer primarily installed in tunnels; a 100 million gallons per day, wet-weather pumping station with associated building; 60 million gallons of additional storage and associated piping to route flows to/from the project site, including 6,200 linear feet of secondary drain line to the Browns Creek Pump Station; attenuation of peak flows from the Omohundro Water Treatment Plant; and associated site improvements. For further information on the background for the project, see attached document "Project Summary" Scope Details Construction Manager at Risk (CMAR) is an alternative project delivery method that involves early engagement of a CMAR to provide pre construction services (progressive estimating, construction phasing, constructability input, Guaranteed Maximum Price (GMP) development) during the design phase and to act as the General Contractor during the construction phase of the project. The intent is to form a defined partnership, i.e., an Integrated Project Team, with Metro Water Services (MWS), its Clean Water Nashville Overflow Abatement Program (CWNOAP) team, the Designer, and the CMAR, to aid in design and constructing the project. Metro has issued an Intent to Award for design services and is in contract negotiation with HDR Engineering. A copy of their Design Proposal is attached for information only named "Design Proposal" The goals of this partnership are to identify and mitigate risks; improve the construction schedule; streamline the design process; improve construction sequencing; reduce the number of projects/contracts for Metro to manage; reduce the probability of Change Orders; maintain conveyance and pumping system operations during construction; effectively construct quality, functional, maintainable improvements; consider overall life cycle costs; develop a project that adheres to the project budget; and improve construction coordination on the site. An important role of the CMAR is to evaluate the constructability of the design to reduce risk in all phases with collaborative, innovative, and cost effective approaches to meet the project’s budget goals. Metro anticipates that the involvement of the CMAR early in the design process will reduce ambiguities, clarification requests, conflicts in design documents, and potential subsequent construction phase changes to documents and improve the constructability of the project, the project budget, and project schedule. A critical goal in this project is to determine pipeline and tunnel alignment as soon as possible so that property acquisition and easement development can take place without delay to construction. Another important goal is to aid the Designer in the determination of the most cost effective pump station physical configuration. Pre construction Services: Phase 1 – Evaluation. Provide input to the Designers in their creation of a Preliminary Engineering Report that includes all of the work elements of the Project Scope section in the Project Summary. The CMAR is expected to provide input regarding constructability, cost development, MBE (5%), WBE (4%)

Award

Water / Sewer

$23,164,000.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
24
Bidding Soon
699
All Active Projects
295
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2021

May 17, 2021

img_map_placeholder

Multiple Locations, Nashville, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.