BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Nashville, Tennessee. Contact the soliciting agency for additional information.

The resulting contract shall not require the services of an engineer or an architect. The objective to be met through the award of this RFP is to enter (a) five year contract with the selected service provider to achieve the purposes listed above. The proposed contract will be an indefinite delivery/indefinite quantity (IDIQ) for the proposed scope. Metro does not guarantee to purchase any minimum or maximum amount of the requested services; these shall be purchased on an as-needed basis. The purpose is to find a qualified company to provide services identified in this RFP in the most cost-effective, professional and efficient way to METRO. CONTRACTOR shall be responsible for completing all maintenance, cleaning, repairs, and parts, both scheduled and non-scheduled during the contract period at current and any future METRO solar installation sites including on-site inspection, assessment, addressing identified issues, complete any necessary adjustment, repair, or replacement of damaged or failed components CONTRACTOR shall be responsible for the supervision, coordination, materials, equipment (including lifting equipment and scaffolds), and supplies necessary to complete services described herein. CONTRACTOR will have and maintain, through the contract period, a current: Tennessee Contractor Electrical License (contractor license with a CE license classification); and North American Board of Certified Energy Practitioners (NABCEP) Certification for operating, commissioning, and maintaining PV systems. CONTRACTOR will be responsible for securing and maintaining all necessary certifications, licenses, permits, and authorizations (and for the costs thereof) required to perform required services. Minority Business Enterprise (MBE) Percentage Goal: 6% Woman Business Enterprise (WBE) Percentage Goal: 6 %

Post-Bid

Municipal

Public - County

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
65
Bidding Soon
1,252
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

September 26, 2022

Project location map

Multiple Locations, Nashville, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.