BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a road / highway in Madison, Wisconsin. Design plans call for site work for a road / highway.

This project funds the reconstruction of Mineral Point Road from the Beltline (USH 12/18) to High Point Road. The project is proposed to be reconstructed with new pavement, median, and multi-use path. Safety enhancements are proposed for the Mineral Point Road and High Point Road intersection. The goal of the project is to provide new pavement and enhance safety for pedestrians and bicyclists. As of June 14, 2022, design is underway by owner in-house staff. It is anticipated construction will start in 2026.

Design

Roads / Highways

$1,510,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
5
Bidding Soon
1,178
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2026

Project location map

Mineral Point Rd, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.