Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 14, 2022 at 8:00 PM
Updated September 14, 2023
Site work for a road / highway in Madison, Wisconsin. Design plans call for site work for a road / highway.
This project funds the reconstruction of Mineral Point Road from the Beltline (USH 12/18) to High Point Road. The project is proposed to be reconstructed with new pavement, median, and multi-use path. Safety enhancements are proposed for the Mineral Point Road and High Point Road intersection. The goal of the project is to provide new pavement and enhance safety for pedestrians and bicyclists. As of June 14, 2022, design is underway by owner in-house staff. It is anticipated construction will start in 2026.
Design
Roads / Highways
$1,510,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2026
Mineral Point Rd, Madison, WI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
