BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Milwaukee, Wisconsin. Working plans call for the renovation of a detention facility.

HVAC modifications to maintain a temperature that does not exceed a Heat Stress Index (HSI) of 78 degrees Fahrenheit (F) including air handling modifications, chilled water modifications and additions, and upgrading controlled devices to operate on direct digital electronic controls. Once completed, this project, will address conditions within the MSDF facility that have contributed to identified ventilation deficiencies and heat stress related issues for staff and inmates. Also part of this project will be HVAC modifications for the kitchen, intake area, laundry, second floor offices, and armory and locksmith areas (located on the second floor). If required, water fan coil units will be installed at officer stations. As of March 30, 2022, this project has an civil engineer and an apparent low general contractor has been determined. A firm construction timeline is not available.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Pre-Construction/Negotiated

Jails / Prisons

$9,300,000.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
68
Bidding Soon
1,143
All Active Projects
455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2022

img_map_placeholder

1015 N 10th St, Milwaukee, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.