BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2022 at 8:00 PM

Updated October 17, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Mesa, Arizona. Completed plans call for the construction of a stadium; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and for outdoor lighting for a stadium.

Shortlisted Firms include: Dig Studio Engineering and Environmental Consultants Environmental Planning Group A construction manager has been awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2021. *The closed solicitation has been included below for reference: The proposed project includes various park and sports facility improvements to the existing Red Mountain Park located at 7745 E. Brown Road in Mesa, Arizona. The project scope includes: Providing full programming documents, conceptual design graphics, schematic design drawings, complete construction documents, and potential construction phase services. Improvements south of Brown Road include construction of up to ten (10) regulation-sized lighted soccer fields, LED lighted parking lot expansion, increase the irrigation capacity through deepening or expansion of the existing Red Mountain Park pond and pumps, a new restroom building, updating the disc golf course layout, and additional landscaping improvements. Improvements north of Brown Road include four LED-lighted youth baseball/softball fields, lighted parking lot expansion, and a new restroom building. Additional scope item may include a traffic impact study for Brown Road. It is anticipated that this project will be constructed utilizing a Construction Manager at Risk (CMAR). The anticipated construction budget is $22.5 million. The City anticipates construction completion by Fall 2023. Shortlist Interviews Week of November 4 Questions. Questions pertaining to the Design Services selection process or contract issues should be directed to Donna Horn of the Engineering Department at donna.horn@mesaaz.gov. The City of Mesa reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. No binding contract will exist between the submitter and the City until the City executes a written contract. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Award

Arenas / Stadiums

$25,899,134.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
41
Bidding Soon
1,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.