BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Jacksonville, Florida. Completed plans call for site work for a road / highway.

Counties: Duval Road Name: SR 105 (Heckscher Dr) Limits: From Dunn Creek to Blount Island Dr Project(s): 43808015201(*) Federal Aid No: 4881069P Total Roadway Length: 1.917 Miles Contract Days: 180 Total Bridge Length: 0.311 Miles Total Proposal Length: 2.228 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days (Acq. time) Railroad insurance is required for this Proposal at time of contract execution. Please see the Specifications Package for more information. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. The improvements under this contract consist of Intelligent Transportation System (ITS) Project on SR 105 (Heckscher Drive) from Dunn Creek to Blount Island Drive including work to be performed on JaxPort property in Duval County in Florida. Project will consist of the installation of Dynamic Message Signs, CCTV Cameras, Microwave Vehicle Detection, Automatic Vehicle Identification, Traffic Signal Upgrades for Adaptive Signalization deployment and other associated incidental construction. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 006 ITS Communication System - SR 105 (Heckscher Dr)

Award

Roads / Highways

$1,519,306.00

Public - State/Provincial

Site Work

76

1

2

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
32
Bidding Soon
626
All Active Projects
267
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2021

February 5, 2021

img_map_placeholder

Heckscher Dr, Jacksonville, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.