Site work and new construction of a mixed-use development in Pasadena, California. Working plans call for the construction of a 2,800-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

**As of May 12 2022, the project has not yet been awarded. A timeline for award has not yet been established.** The construction work to be performed includes, but is not limited to, the following: The project scope includes furnishing and installing a 2,800 SF pre-fabricated modular building, placing new concrete slab and curb, providing new electrical panel and lighting, installing building fixtures, and installing minor landscaping. Contractor shall also be responsible for submitting plans and structural design/calculations for the new pre-fab building to the Citys Building Department for review and approval prior to fabrication and construction. The Contractor is required to submit all required permits (local and State) for demolition and excavation if needed prior to start of work. Contractor Representative is required to notify the Citys Project Manager at least two weeks prior to the start of the contract work. All other code compliance requirements necessary to complete this scope of work not mentioned herein which are required by the Plans, City of Pasadena Standard Specifications, or these bid Specifications, shall be performed, placed, constructed, or installed, and the total bid price submitted shall include the cost of all such incidentals even though they are not specifically mentioned in the preceding description of work or in the Bidders Proposal. Questions due by: Thursday ,April 27, 2022 at 2:00 p.m. Tiffiny Chen E-mail: tchen@cityofpasadena.net (all RFIs must be submitted via e-mail) Online Q&A: No Bid Bond 5.00% Payment Bond 0.00% Performance Bond 0.00% Estimated Bid Value: $100,000 - $150,000 Start/Delivery Date: June 2022 Project Duration: 60 working days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$615,258.00

Public - City

New Construction, Site Work

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
95
Bidding Soon
2,207
All Active Projects
981
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

December 1, 2022

img_map_placeholder

515 N Lake Ave, Pasadena, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.