BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Richfield, Minnesota. Completed plans call for site work for a road / highway; water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a road / highway; and road / highway.

All quantities and work items in this advertisement for bid are approximate and not guaranteed. Description of work: the work includes the construction of approximately: remove concrete pavement 9,900 sqyd rcp sewer pipe 3,100 lin ft remove bituminous pavement 9,600 sqyd construct drainage structure 500 lin ft remove concrete sidewalk 48,100 sqft pvc sewer pipe (8-15) 2,600 un ft common excavation 17,300 cuyd lift station 1 lump sum aggregate base (cv) class 5 5,500 cuyd pedestrian flasher system 4 each type sp 12.5 &. 9.5 bituminous 6,700 ton revise traffic signal system 1 each streets concrete walk 35,700 sqft lighting unit 50 each concrete curb & gutter 11,000 lin ft dip watermain (6-18) 3,400 lin ft 8x4 concrete box cuvert 2036 lin ft construct sanitary mh 170 un ft design special together with numerous related items of work, all in accordance with plans and specifications. All bids shall be made on the proposal forms of the city and shall be accompanied by a cashiers check, bid bond or certified check, payable to the city of richfield for five percent of the amount of bid to be forfeited as liquidated damages in the event that the bid is accepted, and the bidder shall fail to enter promptly into a written contract and furnish the required bond. This Work shall be subject to minimum wages and labor standards in accordance with Minnesota Department of Labor and Industry Prevailing Wages. No bidder may withdraw his bid within 60 days after the scheduled closing time for the receipt of bids. The City Council of Richfield reserves the right to reject any and all bids and to waive informalities. Contractor must start construction operations on May 1, 2022 Completion- November 15, 2024. Contract No #2864, 22-04, B2007463

Award

Roads / Highways

$10,169,400.00

Public - City

Outdoor Lighting, Paving, Site Work

3

26

18

6

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
46
Bidding Soon
781
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 1, 2022

img_map_placeholder

W 65th St, Richfield, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.