Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 27, 2022 at 8:00 PM
Updated September 14, 2023
Demolition, site work and addition to a mixed-use development in Fort Myers, Florida. Completed plans call for the addition of a transportation facility.
As of November 10, 2021, construction is underway and is anticipated to be complete fall 2024. The project consists of a multi-story expansion of the existing terminal’s north face along its entire length between the current checkpoint queues of concourses B and D. The expansion of the building’s footprint extends northward into Concourse C past the existing ramp and security checkpoint. When completed, the expansion will consolidate the airport’s three checkpoints into one and provide for new concession and retail spaces and upgrades to the building’s infrastructure and MEP systems. Also included is a remote loading dock and renovations and improvements to TSA administration space and non-public airport administration spaces. The total area of expansion and renovation is more than 300,000 square feet. All work is as shown and specified in bid documents provided by Atkins dated 18 March 2021. . Construction is anticipated to commence October 2021 and be complete October 2024. Subcontractor prequalification requirements and details can be obtained by contacting the Construction Manager. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Under Construction
Transportation Terminals
$331,000,000.00
Public - Federal
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 15, 2021
October 1, 2021
11000 Terminal Access Rd, Fort Myers, FL
Related To This Project
Fort Myers, FL
Bid Date: May 26 2022
Fort Myers, FL
Bid Date: Mar 09 2022
Fort Myers, FL
Bid Date: May 31 2022
Fort Myers, FL
Bid Date: Apr 26 2022
Fort Myers, FL
Bid Date: Apr 28 2022
Fort Myers, FL
--
Fort Myers, FL
Bid Date: May 27 2022
Fort Myers, FL
Bid Date: May 23 2022
Fort Myers, FL
--
Fort Myers, FL
Bid Date: May 23 2022
Fort Myers, FL
Bid Date: Aug 20 2021
Fort Myers, FL
Bid Date: May 16 2022
Fort Myers, FL
--
Fort Myers, FL
Bid Date: May 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
