Site work for a water / sewer project in Alexandria, Virginia. Completed plans call for site work for a water / sewer project.

The Office of Environmental Quality (a division of Transportation & Environmental Services) continues to actively manage environmental impacts associated with the former 19th century City owned manufactured gas plant (used to provide gas to City street lights) that once operated at the corner of North Lee and Oronoco Streets. The plant historically supplied coal-derived manufactured gas for lighting Alexandria and subsequently left residue in the underlying soil and ground water that have been the ongoing source of oily substances evident beneath the observation deck at the end of Oronoco Street. As a part of the Corrective Action Plan (CAP) undertaken by the City and approved by the Virginia Department of Environmental Quality (VDEQ) through its Voluntary Remediation Program (VRP), the City constructed a bio-remediation system at the foot of Oronoco Street to eliminate the discharge of the oily substances into the Potomac River. This part of the project was completed in July 2013. Phase II of the project consists of (i) dredging and capping the impacted sediment in the Potomac River around the outfall area; and (ii) evaluating the area within the boundary of the VRP for health impacts. The dredging and capping project is aimed at mitigating the discharge of petroleum impacted groundwater from the former manufactured gas plant to the subsurface beyond the original site boundaries and into the Potomac River. Since the project was originally scoped and budgeted, the dredge and cap area has increased, as were the pipe relining plans which resulted in increased project costs. This project was successfully completed in April 2018. A verification sediment sampling was conducted in April 2019 that proved the effectiveness of this project. Another verification sediment sampling is planned for April 2020. The City also engaged another consultant to provide a comprehensive assessment of the project progress, and as a result, long term solutions aimed at accelerating the recovery of the contaminant (coal tar) are being proposed for study in FY 2021 (and implementation in FY 2022). During FY 2020, the City is also developing strategies to complete the VRP requirements that would include a long-term monitoring and maintenance plan and obtain the certificate of completion of this VRP from VDEQ. The City of Alexandria has contracted with Cardno Inc. to install Non-Aqueous Phase Liquid (NAPL) recovery wells along Oronoco Street between North Lee and North Union Streets. The purpose of this installation is to enhance the recovery of coal tar from beneath the street. The project will occur in two phases: PHASE I: Start Date: Tuesday, March 2, 2021 Duration: One week PHASE II: Start Date: Mid-April 2021 Duration: One week

Award

Water / Sewer

$2,950,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
71
Bidding Soon
1,900
All Active Projects
745
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2021

img_map_placeholder

Oronoco St, Alexandria, VA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.