BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work and paving for a road / highway in Sioux City, Iowa. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project will involve acquisition to improve turning movements at the Floyd/Dace intersection. In its present condition, the Floyd/Dace intersection is very difficult for large trucks to maneuver through. Justification: In its present condition, the Floyd/Dace intersection is very difficult for large trucks to maneuver through. This maneuvering difficulty hampers the ability of the stockyards area to attract industry. This intersection will be effected by the I-29 reconstruction and will be designed to accommodate the lane configurations constructed by the Iowa Department of Transportation. This project is included in the city's fy 2025-2029 Capital Improvement Program. As of March 6, 2025, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,725,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
58
Bidding Soon
536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

S Floyd Blvd & Dace Ave, Sioux City, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.