BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 26, 2022 at 8:00 PM

Updated September 15, 2023

Site work, paving and renovation of a bridge / tunnel in Milwaukee, Wisconsin. Working plans call civil work for a bridge / tunnel.

Plans call to construct total three current structures will have various types of work done on them including deck replacement, paint steel girders, and/or other miscellaneous repairs. Bridge B-40-380 consist of Deck Replacement/Paint located in WIS 181 SB- N 76th St over CNW RR, Bridge B-40-381 Deck Replacement/Paint located in WIS 181 NB- N 76th St over CNW RR, and Bridge B-40-402 Deck Replacement, located in WIS 175 – Appleton Ave, Over Menomonee River. As of September 26, 2022, design is nearing completion. A tentative bid schedule has not been disclosed, but construction is expected to commence August 2023.

Final Planning

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
154
Bidding Soon
1,994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

Project location map

Multiple Locations, Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.