BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2019 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Cartersville, Georgia. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all labor, equipment, and materials and performing all work in strict accordance with the plans and specifications for: Storm Drainage System for Old Alabama Road Realignment The location of the work is in an easement on property adjacent the Cartersville-Bartow County Airport, Cartersville, Georgia. Prospective bidders should read the following instructions carefully before submitting their bids. For each item on the bid form there is a space provided for the price to be shown in numerals and words. All notations must be in ink. Totals read at the opening of bids are not guaranteed to be correct and no final award of contract will be made until the bid and extensions have been verified. A Bidder's bond must be executed on the form furnished by the Owner, and the required bond, cash, cashiers check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. Payment will be made monthly on completed work. Retainage will be held by the Owner to a maximum of ten percent (10%) of each progress payment. Envelopes containing bids must be sealed, addressed to the undersigned, and marked as follows: "Bid for Construction at Cartersville-Bartow County Airport, Cartersville, Georgia. Croy Engineering Project 1350.02." Bids will be required to remain open for acceptance or rejection for one-hundred and twenty (120) calendar days after the date of opening of bids. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do business in this State pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance; no bond shall be approved unless the surety is on the United States Department of Treasury's list of approved bond sureties. All work under the contract shall be completed within Ninety (90) calendar days from the issuance of the notice to proceed.

Award

Water / Sewer

$678,426.00

Public - City

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
312
Active Projects
204
Bidding Soon
2,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2019

May 20, 2019

Project location map

Old Alabama Rd, Cartersville, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.