Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 8, 2023 at 7:00 PM
Updated January 27, 2024
Site work and paving for a road / highway in Barrington, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The Illinois Department of Transportation (IDOT) is currently engaged in preliminary engineering and environmental studies (Phase I) to improve Illinois Route 62 (Algonquin Road) from Illinois Route 25 to Illinois Route 68. The project is located in the Village of Barrington Hills in Cook and Kane Counties. Other nearby communities that have the potential to be affected by this improvement are the Villages of Algonquin, Carpentersville, and South Barrington and Kane and Cook Counties. The purpose of the study is to evaluate alternatives to address safety concerns and accommodate existing and projected year 2040 travel demands. This improvement is not currently included in the Department’s FY 2019-2024 Proposed Highway Improvement Program, however it will be included for future funding consideration. As of November 8, 2023, per owner, the project is currently in Phase I, which is expected to be complete by end of 2026. There is no funding currently identified for Phase II (detailed construction plans and land acquisition) or Phase III (construction). The schedule has been delayed by approximately 36-40 months to conduct groundwater monitoring and to complete the Biological Assessment (BA).
Conceptual
Roads / Highways
$100,000,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
IL-25 & IL-62, Barrington, IL
Related To This Project
Barrington, IL
Bid Date: Nov 29 2023
Barrington, IL
Bid Date: Nov 22 2023
Barrington, IL
Bid Date: Nov 24 2023
Barrington, IL
--
Barrington, IL
Bid Date: Jan 09 2024
Barrington, IL
--
Barrington, IL
Bid Date: Mar 23 2021
Barrington, IL
Bid Date: Nov 08 2023
Barrington, IL
Bid Date: Nov 08 2023
Barrington, IL
Bid Date: Oct 07 2021
Barrington, IL
Bid Date: Sep 13 2022
Barrington, IL
Bid Date: Sep 27 2023
Barrington, IL
Bid Date: Mar 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
