BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2024 at 7:00 PM

Updated January 29, 2024

Site work and paving for a mixed-use development in Barrington, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Barrington Community Unit School District 220 Barrington Middle School - Prairie Campus IL Route 68 (Dundee Road) Off-Site Roadway Improvements Barrington, Illinois 3.PREQUALIFICATION OF BIDDERS: All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. Note: Work in the Right-of-Way (ROW) will require Contractor to be pre-qualified and provide a bond to the Illinois Department of Transportation (IDOT). 5.WAGES OF EMPLOYEES: Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. 6.REJECTION OF BIDS: The Owner reserves the right to reject any and all bids and bidders and to waive technicalities. 8.DESCRIPTION OF WORK: Project will include but not limited to: hot-mix asphalt surface and binder courses, HMA pavement patching, PCC sidewalk removal and replacement, PCC concrete curb removal and replacement, landscape restoration, storm sewer improvements, pavement markings, other items needed to complete the proposed improvements within the School Property and IDOT ROW. This project is to be bid as a lump sum contract with supplemental unit prices. 9.BID SECURITY: Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Barrington Community Unit School District 220 shall accompany the bid. 11.CONSTRUCTION SCHEDULE: The Contractor shall begin the work to be performed under the contract after Monday, June 3, 2024. The Contractor shall be substantially complete by Friday, August 2, 2024 and final completion by Friday, August 9, 2024. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with Article 108.09 of the Standard Specifications or other applicable BDE Special Provisions shall apply. Note: a second/third site contractors may be present at these sites; Barrington Middle School - Prairie Campus and Early Learning Center during the Summer completing other construction work.

Award

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

35

5

4

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
539
Active Projects
291
Bidding Soon
3,864
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2023

June 3, 2024

Project location map

IL-68, Barrington, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.