BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Barrington, Illinois. Completed plans call for site work for a water / sewer project.

The project consists modifications to the existing Control Building (Structure 10), including new mechanical fine screens, wash presses, dry-well influent pumps, new influent flow splitter structure (Structure 15);modifications to the primary clarifiers (Structure 15), aeration tanks (Structure 20), existing final clarifiers (Structure 35), and aerobic digesters and adjacent piping gallery (Structure 55);construction of two new final clarifiers and mixed liquor splitter structure (Structure 25);construction of a new Cascade Aeration Structure (Structure 13) and Blower Building (Structure 40), modifications to existing Filter Building (Structure 30), including new tertiary filters, ultraviolet disinfection equipment, and non-potable water pumping equipment, conversion of an unused final clarifier to a waste activated sludge gravity thickener (Structure 50), modifications of the existing Dewatering Building (Structure 60) including a new dewatering centrifuge, new Administrative Building (Structure 90); demolition of several structures, and miscellaneous piping mechanical, heating and air conditioning, electrical, supervisory control and data acquisition, and site improvements. Trades included but not limited to: Structure Demolition, CIP, Concrete Formwork, Concrete Reinforcement, Precast Concrete Hollow Core Plants, Crack Repairs, Masonry, Structural Steel, Steel Joists, Metal Decking, Metal Fabrications, Wood Blocking & Curbing, Millwork, FRP Wall & Ceiling Panels, Waterproofing, Deck Coating, Insulation, Vapor & Air Barriers, Metal Wall Panels, Roofing, Firestopping, Joint Sealants, D/F/H, Fiberglass & Aluminum Storefronts, Overhead Coiling Doors, Aluminum Windows, Glazing, Carpet Tile, Painting, Signage, Toilet Compartments & Accessories, Operable Partitions, Fire Extinguishers & Cabinets, Lockers & Benches, Hanger Rod Canopies, Lab Furniture & Equipment, Window Blinds, Countertops, Floor Mats, Office Furniture, Fire Suppression, Plumbing, HVAC, Electrical, Structure Cabling, Access Control System, Fire Alarm System, Excavation, Dewatering, Erosion Control, Geotextiles, Foundation System, Asphalt Paving, Pavement Markings, Fence & Gate Operators, Chain Link Fences, Landscaping, Site Utilities, Hoists & Cranes, Tote Containment System, Aeration System Equipment, Blowers, Water Boosters, Lobe Pumps, Submersible Pumps, Clarifier Dewatering Pumps, Liquid Chemical System Pumps & Accessories, Mechanical Fine Screens, Sludge Grinders, Submersible Mixers, Clarifier Collectors, Diffusers, & Ultraviolet Disinfection Equipment. *The closed solicitation has been included below for reference: Qualified engineering firms to assist with the design of upgrades at the Village wastewater treatment plant (WWTP.) Upgrades include new wastewater process equipment, concrete coatings, underground piping, manhole coatings, and electric gear. All disadvantaged and other businesses interested in providing a proposal for this work should contact Mr. Kevin Fecske at the Village to discuss this opportunity. The method of Contractor Selection has not been Determined at this time.

GC Bidding

Water / Sewer

$350,000.00

Public - City

Site Work

333

44

113

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
679
Active Projects
312
Bidding Soon
3,921
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2026

July 13, 2026

Project location map

302 N. Raymond Avenue, Barrington, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.