BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and new construction of a civil project in Placerville, California. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a road / highway; water / sewer project; and for the demolition of a bridge / tunnel.

CONTRACT NO. 5084 I CIP NO. 36105028 (77126) Federal Aid No. BRLO 5925(098) The Project is located along Mosquito Road, 1.3 miles north of the Mosquito Rd/Kona Drive intersection, in the County of El Dorado. Details for the Work are in the Plans and Contract Documents. They generally consists of, but are not limited to: Construction of a cast-in-place pre-stressed concrete segmental box girder bridge over South Fork American River; construction of soil nail, tie-back, soldier pile, and reinforced concrete retaining walls; construction of cast-in-drilled-hole (CIDH) concrete piles and optional micropiles; and grading, paving, and drainage system improvements for the re-aligned roadway. Performance, construction or installation of other items or details not mentioned above, that are in the Plans, Standard Plans, Standard Specifications, or these Special Provisions. Consists of constructing bridge pile caps, abutments, piers, superstructure, approach slabs, and barrier rails; bridge abutment return walls and Type 1A retaining walls; pier soldier pile, tie-back, and soil-nail retaining walls; roadway approach sections, Type 1 & 1A retaining walls, culvert, drainage structures, and Midwest Guardrail Systems (MGS); all associated excavation, structure backfill, embankment fill, and rock slope protection. Consists of construction and installation of CIDH piles. All Pier 2 alternatives (Schedules B - D) consisting of 36",48", and 60" CIDH must be bid. After bid opening, the lowest cost Pier 2 alternative schedule will be the Contract Pier 2 Alternative Bid Schedule for construction. The Contract time is five hundred eighty (580) WORKING DAYS. For bonding purposes, the anticipated Project cost is less than $56,000,000.

Bid Results

Bridges / Tunnels

$66,237,895.00

Public - County

Demolition, New Construction, Paving, Site Work

188

44

8

15

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
68
Bidding Soon
1,028
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2022

April 26, 2022

img_map_placeholder

Mosquito Rd, Placerville, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.