BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and new construction of a civil project in Placerville, California. Design plans call for the construction of a bridge / tunnel; for paving for a bridge / tunnel; and for site work for a water / sewer project.

El Dorado County plans to construct two new bridges on Green Valley Road; one at Mound Springs Creek and one at Indian Creek. The District has existing waterlines and two pressure reducing stations (Green Valley PRS #1 and Greenstone PRS #1) on Green Valley Road that will be impacted by the project and require relocation at District cost as they are located in the public right of way. Based on the County's current design, approximately 1,200 feet of 8 and 12-inch waterline will need to be relocated along with both pressure reducing stations. The relocation work needs to be completed in advance of the County's project as the District is in conflict with the new bridge abutments and road realignment. The District has pre-purchased all necessary pressure reducing valves, isolation valves, fittings, for both pressure reducing stations, and is working to complete the relocation design to be bid once the County has completed their right of way acquisition. The County plans to have right of way acquisition complete by the end of 2022. The project has been in the works for several years and dependent on County schedule. Project is included in the El Dorado Irrigation District's (EID) FY 2023 - 2027 CIP. As of April 5, 2023, information regarding a general contractor is not available. Construction is anticipated in 2023/2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Bridges / Tunnels

$950,000.00

Public - County

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
68
Bidding Soon
1,028
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

Green Valley Rd, Placerville, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.