BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Vero Beach, Florida. Completed plans call for site work for a road / highway.

Counties: Indian River Road Name: Cr 606 (Oslo Rd) Limits:From 82nd Ave to 58th Ave and at Sr 9 (1-95) Interchange Project(S): 41304825201 Federal Aid No: N/a Project(S): 41304825202 Federal Aid No: D422093b Project(S): 41304825601 Federal Aid No: N/a Project(S): 41304825602 Federal Aid No: N/a Project(S): 43152115201(*) Federal Aid No: N/a Project(S): 43152115202 Federal Aid No: D423002b Project(S): 43152115601 Federal Aid No: N/a Total Roadway Length: 2.646 Miles Contract Days: 1437 Total Bridge Length: 0.019 Miles Total Proposal Length: 2.665 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 15 Calendar Days For projects in excess of $50 million, in addition to meeting all other qualification requirements of Section 337.14, Florida Statutes, and Rule Chapter 14-22, Florida Administrative Code, any Contractor who is not prequalified and in good standing with the Department as of January 1, 2019, must submit evidence which demonstrates satisfactory completion of at least two projects, each in excess of $15 million, for the Florida Department of Transportation or for any other state department of transportation. Acceptability of the evidence related to the two projects is at the sole discretion of the Department. The improvements under this contract consist of, but not limited to, MOT (standard, speed and law enforcement officer, traffic control officer, radar speed display, portable and static, special detours, temporary barrier, temporary lighting, temporary signalization, temporary traffic detection, business signs), monitor existing structures (inspection, settlement), earthwork (excavation, embankment), geosynthetic reinforcing (soft soils), bridge (removal, superstructure, approach slabs, expansion joints, deck grooving/planning, bearing pads, reinforcing steel, prestressed beams, prestressed piling, test piles), concrete (removal, culvert, mass, seal, substructure, traffic railing, parapet, slope pavement, traffic separator, sidewalk, driveways, ditch pavement), asphalt (temporary maintenance, stabilization, base, milling, superpave, friction, miscellaneous), pollution control (runoff control structure, sediment barrier, floating barrier, staked barrier, soil tracking prevention, inlet protection), fencing (Type A/B/R, gate, barbed wire), conduit (standard, embedded), junction box, tree protection, drainage (curb inlets, manholes, pipe culvert, endwalls, mitered end, underdrain, french drain, curb and gutter, curb, pipe plugging), riprap, bedding stone, guardrail (removals, end treatment, post, special post, pipe rail), sound/noise barrier, retaining wall system, lighting (conduit, pull/splice box, power service, conductors, luminaire, load center, light pole complete, cable distribution system), signalization (ITSFM, conduit, fiber optic, pull/splice box, power service, prestressed pole, aluminum signals pole, steel mast arm assembly, vehicular signal and detection, pedestrian detector, controller), signing (single-post, multi-post, panel, overhead static, highlighted, retroreflective strip, object marker, delineator), pavement markings (detectable, raised, painted, thermoplastic, permanent tape, directional, bike lane), anti-graffiti coating, utilities (pipe, fittings, fixtures, fire hydrant), and sod along CR 606 (Oslo Rd.). Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 Add Lanes and Reconstruct/Drainage Improvements/Milling and Resurfacing/Bridge Replacement

Award

Roads / Highways

$95,783,212.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

579

3

6

6

Subscribe For Documents

141 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
45
Bidding Soon
867
All Active Projects
408
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

June 26, 2023

img_map_placeholder

Oslo Rd, Vero Beach, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.