Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2025 at 8:00 PM
Updated September 4, 2025
Site work and paving for a mixed-use development in Houston, Texas. Design plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Update: Project provides for the design and construction of storm drainage improvements, necessary conc paving, curbs, sidewalks, driveways, and utilities to serve the Arlington Heights Subdivision, CDP outfall C0268, C0272, C0275, C0308, C0309, C0814. Project includes two (2) sub-projects. Project is included City of Houston Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.spartnerships.com/newsletter/2025/tgi-01-24-2025/texas-government-insider-01-24-2025.html The Arlington Heights project will use $13.3 million for its second subproject. Improvements will be made to the area's storm drainage, designed to mitigate structural flooding risks. Plans to enhance street conveyance, sheet flow and available detention facilities will involve replacing waterlines and sanitary sewer systems. The city will also fully reconstruct the streets, upgrade sidewalks, remove trees and install streetlights. ----------------------------------------------------------------------------------------- Project provides for the design and construction of storm drainage improvements, necessary concrete paving, curbs, sidewalks, driveways, and utilities to serve the Arlington Heights Subdivision, CDP outfall C0268, C0272, C0275, C0308, C0309, C0814. Project includes two (2) sub-projects. This project is included in the city's Fiscal Year 2024-2028. As of October 22, 2024, further details regarding construction and completion timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Water / Sewer
$15,215,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Viceroy Dr & Freeton St, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Oct 29 2024
Houston, TX
Bid Date: Nov 11 2024
Houston, TX
--
Houston, TX
--
Houston, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
