BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated February 20, 2025

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

As of January 7, 2024, project was awarded to SER Construction Partners, LLC., awarded amount is $33,296,427.40. Project Name: Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 Project Number: TABS2025006266 Facility Name: Pine Trails Subdivision Location Address: East of Crosby Freeway and North of Wallisville Rd Houston, TX 77049 Location County: Harris Start Date: 1/6/2025 Completion Date: 2/1/2027 Estimated Cost: $2,735,900 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Approximately 36,000 SF of sidewalk and over 200 ramps. Square Footage: 3,600 ft 2 ---------------------------------------------------------- Drainage Improvements in the Pine Trails Subdivision Phase 1, 2, 5, 6 (2018) for Harris County Precinct 2 - UPIN 19101MF14202 Questions Due Date: Nov 1st 2024, 12:00 PM CDT The Pine Trails Subdivision Drainage Improvements Phase 1, Phase 2, Phase 5 and Phase 6 project site consists of subdivision drainage improvements and stormwater detention basins. Phases 1 and 2 are located on the Northwest and Southwest side of the Pine Trails subdivision respectively. Phases 1 and 2 include a proposed storm system and detention basin. The detention basin and storm sewer discharge into HCFCD Channel P109-01-01 at two different locations. Major work activities include off-site disposal of excavation, two stormwater detention basins and storm sewer improvements. The stormwater detention basin construction will consist of clearing and grubbing the site, installation of concrete pilot channels, backslope swales, interceptor structures, emergency overflow weirs, maintenance access roads and outfall structures. Phases 1 and 2 will include installation of storm sewer trunk lines and storm inlets, concrete street reconstruction, replacement of concrete sidewalk, and concrete driveway replacement. The project will also consist of utility adjustments such as water line offset adjustments, water line service adjustments, sanitary sewer main reconstruction, and sanitary sewer service adjustments. Utility adjustments will be constructed in coordination with AquaTX. Phases 5 and 6 are located on the Southeast and Northeast side of the subdivision respectively. These phases only include roadway reconstruction, sidewalk replacement, concrete driveway replacement and inlet/storm sewer lead replacement. Question Deadline 11/01/2024 at 12:00 PM CT Online Portal HARRIS COUNTY FLOOD CONTROL PROJECT NO. 230711044

Award

Water / Sewer

$33,296,427.00

Public - County

Site Work

486

6

8

6

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
5
Bidding Soon
2,141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2024

January 1, 2025

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.