Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 13, 2025 at 8:00 PM
Updated October 1, 2024
Site work, paving and new construction of a water / sewer project in Maxwell, California. Completed plans call civil work for a dam / floodwall.
The scope of work consists of the following: Main dams, saddle dams and dikes, and reservoir rim. Sites Reservoir will require construction of two new dams, Sites Dam (on Stone Corral Creek) and Golden Gate Dam (on Funks Creek), seven saddle dams, and three dikes on the reservoir rim at the top of tributaries to the Hunters Creek drainage. Sites Dam and Golden Gate Dam will be approximately 270 feet high. The saddle dams and dikes will range in height from 6 to 107 feet. Sites and Golden Gate Dams will be founded on rock, with the dam embankment including a central clay Zone 1 core with flanking rockfill shells. Spillway. A concrete overflow spillway will be located on the north side of the reservoir rim, discharging into Hunters Creek to the north. Inlet/Outlet (I/O) works. This facility includes a sloping intake structure with two parallel, concrete-encased 13-foot-diameter pipes, laid on an excavated hill slope. As currently envisioned, the intake works will include inlet ports providing the flexibility to draw or discharge water from seven different elevations in Sites Reservoir. An I/O tunnel, roughly 3,200 linear feet is included in the Reservoir Package and would connect to the downstream infrastructure included in the Conveyance Package. The tunnel would have an excavated diameter of 24.5 feet and an inner diameter of 18.5 feet. Sites Dam Diversion Outlet: The diversion tunnel will be located through the left abutment of Sites Dam. Following construction, the diversion tunnel will be used for stream releases and emergency reservoir releases to Stone Corral Creek. The Sites Diversion Outlet intake will consist of two parallel 10-foot pipes combining into a 14.5-foot inner diameter steel-lined tunnel in the north abutment of Sites Dam. The steel-lined tunnel will continue for about 1,320 linear feet until reaching the outlet structure where the main pipe would bifurcate into two parallel 9.5-foot pipes with butterfly isolation valves and fixed cone valves discharging into energy dissipation chambers. Water exiting the chambers will discharge to a riprap-lined channel connecting to Stone Corral Creek downstream of Sites Dam. Funks Creek Diversion: A temporary 4-foot-diameter steel pipe encased in reinforced concrete in the foundation of Golden Gate Dam will be used to divert flows to Funks Creek during construction. The diversion will be abandoned after construction by plugging the steel pipe with concrete. Sites Lodoga Road Bridges. Two bridges are included in the Reservoir Package. One, approximately 1,900 feet on the west side of Sites Reservoir and a second approximately 2,700 feet long from the middle causeway to the east end of Sites Reservoir. The segment between the two bridges will be constructed with a fill prism. Materials Haul Road Bridge: Running east-west, a single span bridge east of Sites Reservoir along the Sites Lodoga Road realignment will connect to the borrow area near the Golden Gate Dam. Spillway Bridge: This bridge will be constructed over the spillway and supported on spillway walls at each end. The bridge will aligned with the 23 foot -6 inch wide Saddle Dam Road connecting to the North and South Saddle Dam Road west of the spillway. Miscellaneous Construction Access and Permanent roads and Bridges: One new bridge, four bridge replacements, and bridge widening will be constructed at various locations along North Access Road, Road 69, Delevan Road and Funks Construction Access Road to span local creeks and canals. As of December 18, 2024, this project is at 30% design completion. A RFQ will be advertised on January 8, 2025 for a RCMAR (Reservoir Construction Management at Risk). . This will be a two-step process of RFQ, shortlist and then issuance of a Request for Proposals. A construction start date has not been disclosed. All communications regarding the Sites Project, the Reservoir Package, and this procurement shall be directed to the designated Contact Person (Marcia Kivett). Email: boardclerk@sitesproject.org or phone: 561.843.9740
Post-Bid
Water / Sewer
$3,000,000,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 12 - Furnishings
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
January 1, 2026

Maxwell Sites Rd, Maxwell, CA
Related To This Project
Maxwell, CA
Bid Date: Aug 17 2022
Los Angeles, CA
--
Jurupa Valley, CA
Bid Date: Feb 09 2023
Hayward, CA
Bid Date: Mar 28 2023
Pasadena, CA
Bid Date: Oct 20 2022
Pasadena, CA
Bid Date: Oct 20 2022
Newport Beach, CA
--
Newport Beach, CA
Bid Date: Feb 15 2023
Sutter Creek, CA
Bid Date: Nov 01 2022
San Diego, CA
Bid Date: Dec 15 2022
Modesto, CA
Bid Date: Nov 10 2022
Yuba City, CA
Bid Date: Oct 20 2022
Whittier, CA
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Cut Costs, Not Corners.
Get ahead of project risks by targeting the right work early. With detailed construction data at your fingertips, you can pursue jobs that match your margins—and walk away from those that don’t.
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.