EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving and new construction of a water / sewer project in Maxwell, California. Completed plans call civil work for a dam / floodwall.

The scope of work consists of the following: Main dams, saddle dams and dikes, and reservoir rim. Sites Reservoir will require construction of two new dams, Sites Dam (on Stone Corral Creek) and Golden Gate Dam (on Funks Creek), seven saddle dams, and three dikes on the reservoir rim at the top of tributaries to the Hunters Creek drainage. Sites Dam and Golden Gate Dam will be approximately 270 feet high. The saddle dams and dikes will range in height from 6 to 107 feet. Sites and Golden Gate Dams will be founded on rock, with the dam embankment including a central clay Zone 1 core with flanking rockfill shells. Spillway. A concrete overflow spillway will be located on the north side of the reservoir rim, discharging into Hunters Creek to the north. Inlet/Outlet (I/O) works. This facility includes a sloping intake structure with two parallel, concrete-encased 13-foot-diameter pipes, laid on an excavated hill slope. As currently envisioned, the intake works will include inlet ports providing the flexibility to draw or discharge water from seven different elevations in Sites Reservoir. An I/O tunnel, roughly 3,200 linear feet is included in the Reservoir Package and would connect to the downstream infrastructure included in the Conveyance Package. The tunnel would have an excavated diameter of 24.5 feet and an inner diameter of 18.5 feet. Sites Dam Diversion Outlet: The diversion tunnel will be located through the left abutment of Sites Dam. Following construction, the diversion tunnel will be used for stream releases and emergency reservoir releases to Stone Corral Creek. The Sites Diversion Outlet intake will consist of two parallel 10-foot pipes combining into a 14.5-foot inner diameter steel-lined tunnel in the north abutment of Sites Dam. The steel-lined tunnel will continue for about 1,320 linear feet until reaching the outlet structure where the main pipe would bifurcate into two parallel 9.5-foot pipes with butterfly isolation valves and fixed cone valves discharging into energy dissipation chambers. Water exiting the chambers will discharge to a riprap-lined channel connecting to Stone Corral Creek downstream of Sites Dam. Funks Creek Diversion: A temporary 4-foot-diameter steel pipe encased in reinforced concrete in the foundation of Golden Gate Dam will be used to divert flows to Funks Creek during construction. The diversion will be abandoned after construction by plugging the steel pipe with concrete. Sites Lodoga Road Bridges. Two bridges are included in the Reservoir Package. One, approximately 1,900 feet on the west side of Sites Reservoir and a second approximately 2,700 feet long from the middle causeway to the east end of Sites Reservoir. The segment between the two bridges will be constructed with a fill prism. Materials Haul Road Bridge: Running east-west, a single span bridge east of Sites Reservoir along the Sites Lodoga Road realignment will connect to the borrow area near the Golden Gate Dam. Spillway Bridge: This bridge will be constructed over the spillway and supported on spillway walls at each end. The bridge will aligned with the 23 foot -6 inch wide Saddle Dam Road connecting to the North and South Saddle Dam Road west of the spillway. Miscellaneous Construction Access and Permanent roads and Bridges: One new bridge, four bridge replacements, and bridge widening will be constructed at various locations along North Access Road, Road 69, Delevan Road and Funks Construction Access Road to span local creeks and canals. As of December 18, 2024, this project is at 30% design completion. A RFQ will be advertised on January 8, 2025 for a RCMAR (Reservoir Construction Management at Risk). . This will be a two-step process of RFQ, shortlist and then issuance of a Request for Proposals. A construction start date has not been disclosed. All communications regarding the Sites Project, the Reservoir Package, and this procurement shall be directed to the designated Contact Person (Marcia Kivett). Email: boardclerk@sitesproject.org or phone: 561.843.9740

Post-Bid

Water / Sewer

$3,000,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Warranties
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
48
Bidding Soon
798
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

January 1, 2026

img_map_placeholder

Maxwell Sites Rd, Maxwell, CA


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Sites Reservoir - RFQ for CMAR

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.